{"id":38506,"date":"2026-01-09T11:29:02","date_gmt":"2026-01-09T03:29:02","guid":{"rendered":"https:\/\/www.evb.com\/?p=38506"},"modified":"2026-01-12T15:34:03","modified_gmt":"2026-01-12T07:34:03","slug":"iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness","status":"publish","type":"post","link":"https:\/\/www.evb.com\/da\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\/","title":{"rendered":"ISO 15118 &amp; OCPP Implementeringsvirkelighed i 2026"},"content":{"rendered":"<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong>Forfatterorganisation:<\/strong> EVB-opladningsl\u00f8sninger<\/p>\n\n\n\n<p><strong>Perspektiv:<\/strong> Opladerproducent og systemintegrator<\/p>\n\n\n\n<p><strong>Omfang:<\/strong> ISO 15118, Plug &amp; Charge, PKI-styring, OCPP 1.6 \/ 2.0.1, edge intelligence, V2G-monetisering, cybersikkerhed og overholdelse af lovgivningen<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1080\" src=\"https:\/\/www.evb.com\/wp-content\/uploads\/2024\/02\/Application-of-EVB-Split-DC-EV-Charger.webp\" alt=\"Anvendelse af EVB Split DC EV-oplader\" class=\"wp-image-37494\" srcset=\"https:\/\/www.evb.com\/wp-content\/uploads\/2024\/02\/Application-of-EVB-Split-DC-EV-Charger.webp 1920w, https:\/\/www.evb.com\/wp-content\/uploads\/2024\/02\/Application-of-EVB-Split-DC-EV-Charger-1536x864.webp 1536w, https:\/\/www.evb.com\/wp-content\/uploads\/2024\/02\/Application-of-EVB-Split-DC-EV-Charger-18x10.webp 18w, https:\/\/www.evb.com\/wp-content\/uploads\/2024\/02\/Application-of-EVB-Split-DC-EV-Charger-600x338.webp 600w, https:\/\/www.evb.com\/wp-content\/uploads\/2024\/02\/Application-of-EVB-Split-DC-EV-Charger-768x432.webp 768w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><figcaption class=\"wp-element-caption\"><a href=\"https:\/\/www.evb.com\/da\/\">Anvendelse af EVB Split DC EV-oplader<\/a><\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Resum\u00e9 (for beslutningstagere)<\/strong><\/h2>\n\n\n\n<p>I 2026 er ISO 15118 og OCPP ikke l\u00e6ngere valgfrie standarder eller fremtidsrettede muligheder \u2013 de er blevet <strong>missionskritiske foruds\u00e6tninger<\/strong> for kompatibel, skalerbar og kommercielt levedygtig ladeinfrastruktur til elbiler.<\/p>\n\n\n\n<p>EVB&#039;s erfaringer med implementering viser dog, at mange projekter stadig mislykkes, ikke fordi standarder ikke er tilg\u00e6ngelige, men fordi <strong>Tillidsstyring, certifikatlivscyklusstyring, systemintegrationsgr\u00e6nser, begr\u00e6nsninger i responsforsinkelse og lovgivningsm\u00e6ssige forpligtelser er undervurderet.<\/strong>.<\/p>\n\n\n\n<p><strong>Vigtige konklusioner for ledere og investorer:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>ISO 15118 har udviklet sig fra en kommunikationsprotokol til en <strong>ramme for tillids- og identitetsstyring<\/strong>, centreret omkring PKI, styring af certifikatlivscyklus og h\u00e5ndtering af tilbagekaldelser.<\/li>\n\n\n\n<li>Plug &amp; Charge-p\u00e5lidelighed afh\u00e6nger mere af <strong>Certifikatstyring, offline-kontinuitet og backend-koordinering<\/strong> end alene p\u00e5 opladerens hardware.<\/li>\n\n\n\n<li>Selvom OCPP 1.6 teknisk set kan underst\u00f8tte Plug &amp; Charge, repr\u00e6senterer det i 2026 i stigende grad <strong>akkumuleret teknisk g\u00e6ld<\/strong>, prim\u00e6rt drevet af vedligeholdelse og integration af cybersikkerhed.<\/li>\n\n\n\n<li>V2G-parathed handler ikke l\u00e6ngere kun om tovejs str\u00f8mforsyning \u2014 <strong>Netindt\u00e6gtsdeltagelse afh\u00e6nger af responsforsinkelse, lokal kontrollogik og Smart Charging-orkestrering<\/strong>.<\/li>\n\n\n\n<li>Cybersikkerhed og overholdelse af regler (f.eks. EU CRA) er blevet <strong>\u00f8konomiske risikofaktorer<\/strong>, ikke blot tekniske overvejelser.<\/li>\n<\/ul>\n\n\n\n<p>Dette dokument skitserer EVB&#039;s tekniske holdning til, hvordan ISO 15118 og OCPP b\u00f8r implementeres sammen i 2026 for at minimere risiko, bevare tillid og muligg\u00f8re langsigtet operationel fleksibilitet.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1600\" src=\"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/11\/20251119-212027.jpeg\" alt=\"EVB&#039;s portef\u00f8lje af AC- og DC-opladere til elbiler og kommercielle energilagringssystemer\" class=\"wp-image-36118\" style=\"width:829px;height:auto\" srcset=\"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/11\/20251119-212027.jpeg 2560w, https:\/\/www.evb.com\/wp-content\/uploads\/2025\/11\/20251119-212027-1536x960.jpeg 1536w, https:\/\/www.evb.com\/wp-content\/uploads\/2025\/11\/20251119-212027-2048x1280.jpeg 2048w, https:\/\/www.evb.com\/wp-content\/uploads\/2025\/11\/20251119-212027-18x12.jpeg 18w, https:\/\/www.evb.com\/wp-content\/uploads\/2025\/11\/20251119-212027-600x375.jpeg 600w, https:\/\/www.evb.com\/wp-content\/uploads\/2025\/11\/20251119-212027-768x480.jpeg 768w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><figcaption class=\"wp-element-caption\"><a href=\"https:\/\/www.evb.com\/da\/\">EVB AC- og DC-opladningsl\u00f8sninger til elbiler<\/a><\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>1. Hvorfor ISO 15118 og OCPP stadig misforst\u00e5s<\/strong><\/h2>\n\n\n\n<p>I udbud, politikdokumenter og tekniske specifikationer grupperes ISO 15118 og OCPP ofte sammen som generiske interoperabilitetskrav. I praksis styrer de <strong>fundamentalt forskellige ansvarsomr\u00e5der p\u00e5 forskellige systemlag<\/strong>.<\/p>\n\n\n\n<p>EVB&#039;s implementeringserfaring viser, at mange fejl ikke skyldes manglende standarder, men af:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Underst\u00f8ttelse af standarder p\u00e5 det forkerte arkitekturlag<\/li>\n\n\n\n<li>Behandling af protokoloverholdelse som en engangsintegrationsopgave<\/li>\n\n\n\n<li>Undervurdering af l\u00f8bende ansvar s\u00e5som certifikatfornyelse, tilbagekaldelse og styring af tillidsanker<\/li>\n<\/ul>\n\n\n\n<p>I 2026 defineres succesfulde implementeringer mindre af konnektivitet og mere af <strong>hvordan tillid etableres, opretholdes og h\u00e5ndh\u00e6ves p\u00e5 tv\u00e6rs af opladnings\u00f8kosystemet<\/strong>.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2. Systemarkitektur i virkeligheden: Elbil \u2194 Oplader \u2194 Backend<\/strong><\/h2>\n\n\n\n<p><em>Inden for EVSE er &quot;Integrationsgabet&quot; eksplicit implementeret som en <\/em><strong><em>Beskedovers\u00e6ttelsesmotor<\/em><\/strong><em>.)<\/em><\/p>\n\n\n\n<p><strong>Kernebudskab at formidle:<\/strong><\/p>\n\n\n\n<p>ISO 15118, OCPP og IEC 61851 styrer <strong>forskellige, ikke-overlappende lag<\/strong>.<\/p>\n\n\n\n<p>Implementeringsustabilitet opst\u00e5r oftest kl. <strong>EVSE-integrationslag<\/strong>, hvor ISO 15118 tillids- og sessionslogik skal overs\u00e6ttes til OCPP-forretningsworkflows.<\/p>\n\n\n\n<p>Meddelelsesovers\u00e6ttelsesmotoren i EVSE er ansvarlig for:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Kortl\u00e6gning af ISO 15118-godkendelse og certifikatlogik i backend-godkendelsesflows<\/li>\n\n\n\n<li>Tilpasning af opladningsintention med OCPP-sessionskontrol, fakturering og Smart Charging-logik<\/li>\n\n\n\n<li>H\u00e5ndh\u00e6velse af tillidsbeslutninger lokalt, n\u00e5r backend-forbindelsen er forringet<\/li>\n<\/ul>\n\n\n\n<p>Forkert justering p\u00e5 dette lag er fortsat en af de mest almindelige \u00e5rsager til fejl i den virkelige verden.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>3. Hvad ISO 15118-st\u00f8tte betyder i praksis (2026-basislinje)<\/strong><\/h2>\n\n\n\n<p><strong>Kernebudskab at formidle:<\/strong><\/p>\n\n\n\n<p>Tilslut og oplad er <strong>ikke en engangsfunktion<\/strong>, men et l\u00f8bende operationelt system.<\/p>\n\n\n\n<p>I praksis opst\u00e5r de fleste fejl under <strong>certifikatfornyelse, tilbagekaldelseskontroller og opdateringer af tillidsk\u00e6der<\/strong>, som ofte undervurderes under planl\u00e6gningen.<\/p>\n\n\n\n<p>I produktionsimplementeringer indeb\u00e6rer ISO 15118-underst\u00f8ttelse ikke fuld d\u00e6kning af specifikationer.<\/p>\n\n\n\n<p>Den effektive baseline, der observeres i succesfulde projekter, omfatter:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>P\u00e5lidelig tilslutning og opladning (ISO 15118-2 eller ISO 15118-20)<\/li>\n\n\n\n<li>Stabil h\u00e5ndtering af certifikatudveksling, validering og tilbagekaldelse<\/li>\n\n\n\n<li>Backend-autorisationskompatibilitet p\u00e5 tv\u00e6rs af flere eMSP&#039;er<\/li>\n\n\n\n<li>Interoperabilitet med flere OEM-implementeringer<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Avancerede scenarier: ISO 15118-20, DASH, DLM og h\u00f8jdensitetsopladningshubs<\/strong><\/h3>\n\n\n\n<p>I store ladestationer med flere bays introducerer ISO 15118-20 yderligere kompleksitet gennem <strong>DASH (Dynamisk associations- og selektionshierarki)<\/strong>.<\/p>\n\n\n\n<p>Dynamisk forbindelse mellem k\u00f8ret\u00f8j og lader bliver en ikke-triviel udfordring, der kr\u00e6ver t\u00e6t koordinering mellem EVSE-logik og backend-orkestrering. <strong>is\u00e6r kritisk for automatiseret parkeringsserviceopladning og scenarier med flere k\u00f8ret\u00f8jers depot<\/strong>, herunder fl\u00e5der af tunge lastbiler og logistikknudepunkter.<\/p>\n\n\n\n<p>I implementeringerne i 2026 opererer DASH i stigende grad i samarbejde med <strong>Dynamisk belastningsstyring (DLM)<\/strong>.<\/p>\n\n\n\n<p>Under begr\u00e6nsninger i elnettet er form\u00e5let med DASH ikke blot at etablere konnektivitet, men at muligg\u00f8re <strong>lokal beslutningslogik<\/strong> der bestemmer hvilket k\u00f8ret\u00f8j der prioriteres til ISO 15118-sessionsallokering, n\u00e5r den tilg\u00e6ngelige kapacitet er begr\u00e6nset.<\/p>\n\n\n\n<p>I s\u00e5danne milj\u00f8er spiller lokale motorer p\u00e5 EVSE-niveau en afg\u00f8rende rolle ved at:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Evaluering af realtidsbegr\u00e6nsninger i str\u00f8mnettet og p\u00e5 stedet<\/li>\n\n\n\n<li>Prioritering af k\u00f8ret\u00f8jer baseret p\u00e5 afgangstidspunkt, fl\u00e5depolitik eller operationel hastende karakter<\/li>\n\n\n\n<li>Koordinering af ISO 15118-handshake-allokering i overensstemmelse hermed<\/li>\n<\/ul>\n\n\n\n<p>Denne t\u00e6tte kobling mellem ISO 15118-20, DASH og DLM er afg\u00f8rende for <strong>skalerbare opladningsoperationer med h\u00f8j t\u00e6thed<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>V2G Beyond Technology: Aktivering af netindt\u00e6gter og responsforsinkelse<\/strong><\/h3>\n\n\n\n<p>I VPP- og netservicescenarier i 2026 ligger v\u00e6rdien af ISO 15118-20 ikke kun i at muligg\u00f8re tovejs energistr\u00f8m, men ogs\u00e5 i at underst\u00f8tte <strong>millisekundniveau responslatens gennem lokal kontrollogik<\/strong>.<\/p>\n\n\n\n<p>Frekvensregulering og lignende nettjenester stiller strenge krav til svartid, som ikke kan opfyldes alene gennem cloud-kommunikation rundturs.<\/p>\n\n\n\n<p>Succesfuld monetarisering afh\u00e6nger derfor af <strong>lokal beslutningstagning<\/strong>, koordineret via ISO 15118-20 og OCPP 2.0.1 Smart Charging-profiler.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>4. OCPP-versionering og realiteten af teknisk g\u00e6ld<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>4.1 OCPP 1.6 i ISO 15118-projekter<\/strong><\/h3>\n\n\n\n<p>Mange implementerede netv\u00e6rk fungerer stadig p\u00e5 OCPP 1.6. Selvom Plug &amp; Charge kan underst\u00f8ttes via applikationsnoter og DataTransfer-mekanismer, repr\u00e6senterer denne tilgang i stigende grad <strong>teknisk g\u00e6ld<\/strong> i 2026.<\/p>\n\n\n\n<p>Ud over de grundl\u00e6ggende driftsomkostninger ligger den prim\u00e6re byrde i <strong>Overhead for vedligeholdelse og integration af cybersikkerhed<\/strong>, herunder:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Brugerdefinerede sikkerhedsrettelser, der opfylder skiftende lovgivningsm\u00e6ssige krav<\/li>\n\n\n\n<li>Manuelle eller semi-manuelle arbejdsgange til klarg\u00f8ring og fornyelse af certifikater<\/li>\n\n\n\n<li>Leverand\u00f8rspecifikke tilpasninger for at kompensere for manglende native sikkerhedskonstruktioner<\/li>\n<\/ul>\n\n\n\n<p>Som f\u00f8lge heraf er omkostningerne ved at holde OCPP 1.6-kompatibel ikke l\u00e6ngere drevet af den daglige drift, men af <strong>l\u00f8bende sikkerhedseftermontering og integrationsindsats<\/strong>.<\/p>\n\n\n\n<p>I mange implementeringer i 2026, <strong>De samlede omkostninger til vedligeholdelse og integration af cybersikkerhed p\u00e5 OCPP 1.6 overstiger omkostningerne ved at migrere til OCPP 2.0.1<\/strong>, selv f\u00f8r der tages h\u00f8jde for langsigtet skalerbarheds- og compliance-risiko.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>4.2 OCPP 2.0.1 som den strukturelle basislinje<\/strong><\/h3>\n\n\n\n<p>OCPP 2.0.1 leverer indbygget ISO 15118-underst\u00f8ttelse, klarere sikkerhedsmodeller og indbyggede Smart Charging-profiler.<\/p>\n\n\n\n<p>EVB ser OCPP 2.0.1 som den <strong>strukturelt korrekt arkitektur<\/strong> til langsigtede implementeringer, selv n\u00e5r faseopdelt migrering er p\u00e5kr\u00e6vet.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>5. Almindelige faldgruber ved implementering observeret af EVB<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Faldgrube 1: Kompleksitet af tillidsanker med flere rods<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Grund\u00e5rsag:<\/strong> Flere OEM&#039;er introducerer parallelle tillidsankre, hvilket skaber komplekse valideringsstier.<\/li>\n\n\n\n<li><strong>Observeret effekt:<\/strong> Inkonsekvent Plug &amp; Charge-adf\u00e6rd p\u00e5 tv\u00e6rs af m\u00e6rker.<\/li>\n\n\n\n<li><strong>Afb\u00f8dningsstrategi:<\/strong> Eksplicit administration af multi-root-trust-anker og samlet valideringslogik.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Faldgrube 2: Behandling af ISO 15118 som en engangsintegration<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Grund\u00e5rsag:<\/strong> Visning af ISO 15118 som firmwarefunktionalitet i stedet for et operativsystem.<\/li>\n\n\n\n<li><strong>Observeret effekt:<\/strong> Skalering af fejl p\u00e5 tv\u00e6rs af PKI-\u00f8kosystemer.<\/li>\n\n\n\n<li><strong>Afb\u00f8dningsstrategi:<\/strong> Livscyklusorienteret certifikatstyring og l\u00f8bende interoperabilitetstest.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Faldgrube 3: Forsinket ISO 15118-20-overvejelse<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Grund\u00e5rsag:<\/strong> Uds\u00e6ttelse af V2G-parathed til efter hardwareudrulning.<\/li>\n\n\n\n<li><strong>Observeret effekt:<\/strong> Dyre eftermonteringer og tabte muligheder for netdeltagelse.<\/li>\n\n\n\n<li><strong>Afb\u00f8dningsstrategi:<\/strong> Hardware- og firmwareparathed i indk\u00f8bsfasen.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Faldgrube 4: OCPP-versionsl\u00e5sning<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Grund\u00e5rsag:<\/strong> Overtilpassede OCPP 1.6 implementeringer.<\/li>\n\n\n\n<li><strong>Observeret effekt:<\/strong> Backend-afh\u00e6ngighed og opgraderingsbarrierer.<\/li>\n\n\n\n<li><strong>Afb\u00f8dningsstrategi:<\/strong> Defineret migreringssti til OCPP 2.0.1.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Faldgrube 5: Netv\u00e6rkslatenstid og TLS-timeouts<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Grund\u00e5rsag:<\/strong> ISO 15118 TLS-handshakes og certifikatkontroller er f\u00f8lsomme over for netv\u00e6rkslatenstid.<\/li>\n\n\n\n<li><strong>Observeret effekt:<\/strong> Fejl ved Plug &amp; Charge i underjordiske garager eller milj\u00f8er med svag 4G\/5G.<\/li>\n\n\n\n<li><strong>Afb\u00f8dningsstrategi:<\/strong> Lokal certifikatforh\u00e5ndscache og kantforh\u00e5ndsvalidering for at reducere afh\u00e6ngigheden af realtidsforbindelse.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>6. EVB Teknisk Stilling<\/strong><\/h2>\n\n\n\n<p>EVB&#039;s tekniske position er forankret i en <strong>designfilosofi, der prioriterer operationel stabilitet, cybersikkerhedsrobusthed og langsigtet tilpasningsevne frem for blot overholdelse af specifikationer<\/strong>.<\/p>\n\n\n\n<p>Vores opladerplatforme repr\u00e6senterer denne filosofi gennem:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Indbygget underst\u00f8ttelse af ISO 15118 Plug &amp; Charge-arkitekturer<\/li>\n\n\n\n<li>Hardware- og firmware-parathed til ISO 15118-20 tovejsopladning<\/li>\n\n\n\n<li>Sikr hovedkontrolpaneler med <strong>Hardwaresikkerhedsmoduler (HSM&#039;er)<\/strong> til beskyttelse af kryptografiske n\u00f8gler, underst\u00f8tter <strong>sikker opstart og sikre firmwareopdateringsmekanismer<\/strong> at etablere en komplet end-to-end tillidsk\u00e6de<\/li>\n\n\n\n<li>Tilpasning til nye regulatoriske forventninger s\u00e5som <strong>EU&#039;s lov om cybermodstandsdygtighed (CRA)<\/strong> og amerikanske cybersikkerhedskrav<\/li>\n\n\n\n<li>Kompatibilitet med b\u00e5de OCPP 1.6 (definerede applikationsprofiler) og OCPP 2.0.1<\/li>\n\n\n\n<li>Interoperabilitetsorienteret udvikling valideret gennem testning med flere leverand\u00f8rer<\/li>\n\n\n\n<li>St\u00f8tte til <strong>lokal controller og edge-proxy-arkitekturer<\/strong> for at opretholde Plug &amp; Charge-kontinuitet under periodisk tilslutning<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Kryptoagilitet og regulatorisk pr\u00e6mie<\/strong><\/h3>\n\n\n\n<p>EVB&#039;s tekniske position omfatter yderligere <strong>kryptografisk agilitet<\/strong> som et centralt designprincip.<\/p>\n\n\n\n<p>Efterh\u00e5nden som levetiden for globale TLS-certifikater forts\u00e6tter med at forkortes \u2013 og n\u00e5r <strong>200 dage fra marts 2026<\/strong> og tendens mod endnu kortere gyldighedsperioder \u2014 langsigtede ISO 15118-implementeringer kr\u00e6ver <strong>automatiseret og fleksibel certifikath\u00e5ndtering<\/strong>.<\/p>\n\n\n\n<p>EVB-platforme underst\u00f8tter automatiserede mekanismer til styring af certifikatlivscyklus, herunder <strong>ACME-baserede arbejdsgange<\/strong>og er designet med kryptoagilitet for at im\u00f8dekomme udviklende kryptografiske krav. Dette inkluderer beredskab til fremtidige <strong>postkvantekryptografi (PQC)<\/strong> overgange uden at kr\u00e6ve udskiftning af hardware.<\/p>\n\n\n\n<p>Parallelt anerkender EVB den voksende <strong>regulatorisk pr\u00e6mie<\/strong> forbundet med overholdelse af cybersikkerhedsregler.<\/p>\n\n\n\n<p>Med EU&#039;s lov om cybermodstandsdygtighed (CRA), der h\u00e5ndh\u00e6ver obligatoriske forpligtelser til rapportering af s\u00e5rbarheder og afhj\u00e6lpning fra <strong>september 2026<\/strong>EVB tilpasser sine udviklings- og driftsprocesser til strukturerede <strong>Processer for h\u00e5ndtering af s\u00e5rbarheder (VMP)<\/strong>.<\/p>\n\n\n\n<p>Denne tilgang reducerer risikoen for compliance downstream for ladestationsoperat\u00f8rer (CPO&#039;er) og hj\u00e6lper dem med at undg\u00e5 regulatoriske sanktioner, samtidig med at systemets langsigtede robusthed opretholdes.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>7. Strategisk udsigt ud over 2026<\/strong><\/h2>\n\n\n\n<p>Efterh\u00e5nden som elbiler bliver integrerede komponenter i intelligente energisystemer, vil konkurrencefordele i stigende grad afh\u00e6nge af:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Tillidsstyring snarere end r\u00e5 konnektivitet<\/li>\n\n\n\n<li>Kantintelligens snarere end centraliseret kontrol<\/li>\n\n\n\n<li>\u00d8konomisk integration med energimarkeder i stedet for isolerede ladesessioner<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"700\" src=\"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/dc-ev-charging-solution-for-electric-heavy-truck.webp\" alt=\"DC ev-opladningsl\u00f8sning til elektrisk tung lastbil\" class=\"wp-image-36451\" srcset=\"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/dc-ev-charging-solution-for-electric-heavy-truck.webp 1920w, https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/dc-ev-charging-solution-for-electric-heavy-truck-1536x560.webp 1536w, https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/dc-ev-charging-solution-for-electric-heavy-truck-18x7.webp 18w, https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/dc-ev-charging-solution-for-electric-heavy-truck-600x219.webp 600w, https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/dc-ev-charging-solution-for-electric-heavy-truck-768x280.webp 768w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><figcaption class=\"wp-element-caption\">EVB BLDC DC EV-opladningsl\u00f8sning til elektrisk tung lastbil<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>8. EVB-implementeringsberedskabstjekliste (2026-udgaven)<\/strong><\/h2>\n\n\n\n<p><em>En praktisk selvevaluering for CPO&#039;er og OEM&#039;er<\/em><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>PKI-agnostiker?<\/strong> Underst\u00f8tter flere OEM-rodcertifikater samtidigt<\/li>\n\n\n\n<li><strong>Offline kontinuitet?<\/strong> Lokal certifikatcaching og validering under netv\u00e6rksafbrydelser<\/li>\n\n\n\n<li><strong>Cyberrobust?<\/strong> Private n\u00f8gler gemt i HSM&#039;er med sikker opstart og sikker firmwareopdatering<\/li>\n\n\n\n<li><strong>Kan man monetisere V2G?<\/strong> OCPP 2.0.1 Smart Charging-profiler aktiveret til nettjenester<\/li>\n\n\n\n<li><strong>Klar til migrering?<\/strong> OTA-underst\u00f8ttet migrering fra OCPP 1.6 til 2.0.1<\/li>\n<\/ul>\n\n\n\n<p>Til pr\u00e6sentationer for ledere og indk\u00f8bsevalueringer kan denne tjekliste visualiseres som et radardiagram, der sammenligner traditionelle implementeringer med EVB&#039;s 2026-klare arkitektur.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Konklusion<\/strong><\/h2>\n\n\n\n<p>I 2026 definerer ISO 15118 og OCPP <strong>tillid, kontrol og \u00f8konomisk fundament<\/strong> af moderne ladeinfrastruktur til elbiler.<\/p>\n\n\n\n<p>EVB&#039;s holdning er klar: b\u00e6redygtig succes opn\u00e5s ikke gennem maksimal protokold\u00e6kning, men gennem <strong>korrekt tillidsarkitektur, kryptografisk agilitet, kantintelligens, regulatorisk beredskab og robust systemintegration.<\/strong><\/p>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Authoring Organization: EVB Charging Solutions Perspective: Charger Manufacturer &amp; System Integrator Scope: ISO 15118, Plug &amp; Charge, PKI governance, OCPP 1.6 \/ 2.0.1, edge intelligence, V2G monetization, cybersecurity &amp; regulatory compliance Executive Summary (For Decision Makers) By 2026, ISO 15118 and OCPP are no longer optional standards or future-facing capabilities \u2014 they have become mission-critical [&hellip;]<\/p>","protected":false},"author":3,"featured_media":37915,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[140,137,135,99,134,126,139,136,138],"class_list":["post-38506","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-cybersecurity-compliance","tag-ev-charging-infrastructure","tag-ev-charging-standards","tag-iso-15118","tag-ocpp","tag-ocpp-2-0-1","tag-pki-certificate-management","tag-plug-and-charge","tag-v2g-charging"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>ISO 15118 vs OCPP: Deployment Reality, Security &amp; Grid Integration in 2026<\/title>\n<meta name=\"description\" content=\"A technical position paper on ISO 15118 and OCPP deployment in 2026, covering Plug &amp; Charge, PKI governance, cybersecurity compliance, V2G readiness, and high-density charging site operations.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.evb.com\/da\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\/\" \/>\n<meta property=\"og:locale\" content=\"da_DK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ISO 15118 vs OCPP: Deployment Reality, Security &amp; Grid Integration in 2026\" \/>\n<meta property=\"og:description\" content=\"A technical position paper on ISO 15118 and OCPP deployment in 2026, covering Plug &amp; Charge, PKI governance, cybersecurity compliance, V2G readiness, and high-density charging site operations.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.evb.com\/da\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\/\" \/>\n<meta property=\"og:site_name\" content=\"EVB\" \/>\n<meta property=\"article:published_time\" content=\"2026-01-09T03:29:02+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-12T07:34:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/EVB-4-Guns-120kw-to-480kw-dc-ev-charger.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"evb\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skrevet af\" \/>\n\t<meta name=\"twitter:data1\" content=\"evb\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimeret l\u00e6setid\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\\\/\"},\"author\":{\"name\":\"evb\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/#\\\/schema\\\/person\\\/fe8f0137976034abdfd2ae4f8c5682d0\"},\"headline\":\"ISO 15118 &amp; OCPP Deployment Reality in 2026\",\"datePublished\":\"2026-01-09T03:29:02+00:00\",\"dateModified\":\"2026-01-12T07:34:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\\\/\"},\"wordCount\":1577,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/EVB-4-Guns-120kw-to-480kw-dc-ev-charger.webp\",\"keywords\":[\"Cybersecurity compliance\",\"EV charging infrastructure\",\"EV charging standards\",\"ISO 15118\",\"OCPP\",\"OCPP 2.0.1\",\"PKI certificate management\",\"Plug and Charge\",\"V2G charging\"],\"articleSection\":[\"Blog\"],\"inLanguage\":\"da-DK\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.evb.com\\\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\\\/\",\"url\":\"https:\\\/\\\/www.evb.com\\\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\\\/\",\"name\":\"ISO 15118 vs OCPP: Deployment Reality, Security & Grid Integration in 2026\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/EVB-4-Guns-120kw-to-480kw-dc-ev-charger.webp\",\"datePublished\":\"2026-01-09T03:29:02+00:00\",\"dateModified\":\"2026-01-12T07:34:03+00:00\",\"description\":\"A technical position paper on ISO 15118 and OCPP deployment in 2026, covering Plug & Charge, PKI governance, cybersecurity compliance, V2G readiness, and high-density charging site operations.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\\\/#breadcrumb\"},\"inLanguage\":\"da-DK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.evb.com\\\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/EVB-4-Guns-120kw-to-480kw-dc-ev-charger.webp\",\"contentUrl\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/EVB-4-Guns-120kw-to-480kw-dc-ev-charger.webp\",\"width\":1280,\"height\":720,\"caption\":\"EVB 4 Guns 120kw to 480kw dc ev charger\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.evb.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ISO 15118 &amp; OCPP Deployment Reality in 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/#website\",\"url\":\"https:\\\/\\\/www.evb.com\\\/\",\"name\":\"EVB\",\"description\":\"Smart EV Charging &amp; Energy Storage Solutions\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.evb.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"da-DK\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/#organization\",\"name\":\"EVB\",\"url\":\"https:\\\/\\\/www.evb.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/evb-3.png\",\"contentUrl\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/evb-3.png\",\"width\":605,\"height\":626,\"caption\":\"EVB\"},\"image\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/#\\\/schema\\\/person\\\/fe8f0137976034abdfd2ae4f8c5682d0\",\"name\":\"evb\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"da-DK\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g\",\"caption\":\"evb\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ISO 15118 vs OCPP: Deployment Reality, Security & Grid Integration in 2026","description":"A technical position paper on ISO 15118 and OCPP deployment in 2026, covering Plug & Charge, PKI governance, cybersecurity compliance, V2G readiness, and high-density charging site operations.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.evb.com\/da\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\/","og_locale":"da_DK","og_type":"article","og_title":"ISO 15118 vs OCPP: Deployment Reality, Security & Grid Integration in 2026","og_description":"A technical position paper on ISO 15118 and OCPP deployment in 2026, covering Plug & Charge, PKI governance, cybersecurity compliance, V2G readiness, and high-density charging site operations.","og_url":"https:\/\/www.evb.com\/da\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\/","og_site_name":"EVB","article_published_time":"2026-01-09T03:29:02+00:00","article_modified_time":"2026-01-12T07:34:03+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/EVB-4-Guns-120kw-to-480kw-dc-ev-charger.webp","type":"image\/webp"}],"author":"evb","twitter_card":"summary_large_image","twitter_misc":{"Skrevet af":"evb","Estimeret l\u00e6setid":"8 minutter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.evb.com\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\/#article","isPartOf":{"@id":"https:\/\/www.evb.com\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\/"},"author":{"name":"evb","@id":"https:\/\/www.evb.com\/#\/schema\/person\/fe8f0137976034abdfd2ae4f8c5682d0"},"headline":"ISO 15118 &amp; OCPP Deployment Reality in 2026","datePublished":"2026-01-09T03:29:02+00:00","dateModified":"2026-01-12T07:34:03+00:00","mainEntityOfPage":{"@id":"https:\/\/www.evb.com\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\/"},"wordCount":1577,"commentCount":0,"publisher":{"@id":"https:\/\/www.evb.com\/#organization"},"image":{"@id":"https:\/\/www.evb.com\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\/#primaryimage"},"thumbnailUrl":"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/EVB-4-Guns-120kw-to-480kw-dc-ev-charger.webp","keywords":["Cybersecurity compliance","EV charging infrastructure","EV charging standards","ISO 15118","OCPP","OCPP 2.0.1","PKI certificate management","Plug and Charge","V2G charging"],"articleSection":["Blog"],"inLanguage":"da-DK","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.evb.com\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.evb.com\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\/","url":"https:\/\/www.evb.com\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\/","name":"ISO 15118 vs OCPP: Deployment Reality, Security & Grid Integration in 2026","isPartOf":{"@id":"https:\/\/www.evb.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.evb.com\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\/#primaryimage"},"image":{"@id":"https:\/\/www.evb.com\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\/#primaryimage"},"thumbnailUrl":"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/EVB-4-Guns-120kw-to-480kw-dc-ev-charger.webp","datePublished":"2026-01-09T03:29:02+00:00","dateModified":"2026-01-12T07:34:03+00:00","description":"A technical position paper on ISO 15118 and OCPP deployment in 2026, covering Plug & Charge, PKI governance, cybersecurity compliance, V2G readiness, and high-density charging site operations.","breadcrumb":{"@id":"https:\/\/www.evb.com\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\/#breadcrumb"},"inLanguage":"da-DK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.evb.com\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\/"]}]},{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/www.evb.com\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\/#primaryimage","url":"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/EVB-4-Guns-120kw-to-480kw-dc-ev-charger.webp","contentUrl":"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/EVB-4-Guns-120kw-to-480kw-dc-ev-charger.webp","width":1280,"height":720,"caption":"EVB 4 Guns 120kw to 480kw dc ev charger"},{"@type":"BreadcrumbList","@id":"https:\/\/www.evb.com\/iso-15118-ocpp-in-2026-real-world-deployment-pki-and-grid-readiness\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.evb.com\/"},{"@type":"ListItem","position":2,"name":"ISO 15118 &amp; OCPP Deployment Reality in 2026"}]},{"@type":"WebSite","@id":"https:\/\/www.evb.com\/#website","url":"https:\/\/www.evb.com\/","name":"EVB","description":"Smart EV Charging &amp; Energy Storage Solutions","publisher":{"@id":"https:\/\/www.evb.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.evb.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"da-DK"},{"@type":"Organization","@id":"https:\/\/www.evb.com\/#organization","name":"EVB","url":"https:\/\/www.evb.com\/","logo":{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/www.evb.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.evb.com\/wp-content\/uploads\/2021\/03\/evb-3.png","contentUrl":"https:\/\/www.evb.com\/wp-content\/uploads\/2021\/03\/evb-3.png","width":605,"height":626,"caption":"EVB"},"image":{"@id":"https:\/\/www.evb.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.evb.com\/#\/schema\/person\/fe8f0137976034abdfd2ae4f8c5682d0","name":"evb","image":{"@type":"ImageObject","inLanguage":"da-DK","@id":"https:\/\/secure.gravatar.com\/avatar\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g","caption":"evb"}}]}},"_links":{"self":[{"href":"https:\/\/www.evb.com\/da\/wp-json\/wp\/v2\/posts\/38506","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.evb.com\/da\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.evb.com\/da\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.evb.com\/da\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.evb.com\/da\/wp-json\/wp\/v2\/comments?post=38506"}],"version-history":[{"count":6,"href":"https:\/\/www.evb.com\/da\/wp-json\/wp\/v2\/posts\/38506\/revisions"}],"predecessor-version":[{"id":38512,"href":"https:\/\/www.evb.com\/da\/wp-json\/wp\/v2\/posts\/38506\/revisions\/38512"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.evb.com\/da\/wp-json\/wp\/v2\/media\/37915"}],"wp:attachment":[{"href":"https:\/\/www.evb.com\/da\/wp-json\/wp\/v2\/media?parent=38506"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.evb.com\/da\/wp-json\/wp\/v2\/categories?post=38506"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.evb.com\/da\/wp-json\/wp\/v2\/tags?post=38506"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}