{"id":38739,"date":"2026-01-23T18:38:38","date_gmt":"2026-01-23T10:38:38","guid":{"rendered":"https:\/\/www.evb.com\/?p=38739"},"modified":"2026-01-26T13:06:40","modified_gmt":"2026-01-26T05:06:40","slug":"megawatt-charging-system-mcs-deployment-in-2026","status":"publish","type":"post","link":"https:\/\/www.evb.com\/ro\/megawatt-charging-system-mcs-deployment-in-2026\/","title":{"rendered":"Implementarea sistemului de \u00eenc\u0103rcare Megawatt (MCS) \u00een 2026"},"content":{"rendered":"<p><em>Implementarea MCS \u00een 2026 nu este decis\u0103 de calific\u0103rile conectorilor. Este decis\u0103 de realitatea re\u021belei, comportamentul termic \u0219i timpul de func\u021bionare. Acest ghid explic\u0103 c\u00e2nd MCS are sens, c\u00e2nd este o investi\u021bie proast\u0103 \u0219i ce lucr\u0103ri de inginerie trebuie efectuate \u00een amonte pentru a evita defec\u021biunile.<\/em><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">1) Ce este MCS (\u0219i ce nu este)<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Ce este<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>O abordare de \u00eenc\u0103rcare DC pentru sarcini grele care vizeaz\u0103 <strong>Transfer de putere de clas\u0103 MW<\/strong> pentru cicluri de func\u021bionare cu constr\u00e2ngeri de timp (noduri de coridor, cur\u021bi de mare randament, rota\u021bie \u00een depozite).<\/li>\n\n\n\n<li>O actualizare la nivel de sistem care \u00eempinge constr\u00e2ngerile \u00een amonte: <strong>interconectare la re\u021bea<\/strong>, <strong>coordonarea protec\u021biei<\/strong>, <strong>management termic<\/strong>\u0219i <strong>preg\u0103tire opera\u021bional\u0103<\/strong>.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Ceea ce nu este<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Nu este o modernizare universal\u0103 pentru fiecare depozit de flot\u0103. Dac\u0103 vehiculele sta\u021bioneaz\u0103 peste noapte \u0219i constr\u00e2ngerile de debit sunt modeste, <strong>CCS cu partajare a energiei<\/strong> adesea c\u00e2\u0219tig\u0103 prin cost total \u0219i simplitate.<\/li>\n\n\n\n<li>Nu este o construc\u021bie de tipul \u201eset and forget\u201d. Site-urile din clasa MW se comport\u0103 ca sarcini industriale: punerea \u00een func\u021biune, testele de acceptare \u0219i disciplina opera\u021bional\u0103 conteaz\u0103 la fel de mult ca hardware-ul.<\/li>\n<\/ul>\n\n\n\n<p><strong>Not\u0103 de la inginer:<\/strong>Cea mai rapid\u0103 modalitate de a deraia un program MCS este s\u0103 \u00eel tratezi ca pe \u201eachizi\u021bionarea unui \u00eenc\u0103rc\u0103tor\u201d. \u00cen 2026, se va comporta mai mult ca punerea \u00een func\u021biune a unui <strong>sarcin\u0103 industrial\u0103 adiacent\u0103 substa\u021biei<\/strong> cu a\u0219tept\u0103ri stricte privind timpul de func\u021bionare.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">2) C\u00e2nd MCS este o investi\u021bie excelent\u0103 - \u0219i c\u00e2nd este una proast\u0103<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">MCS tinde s\u0103 aib\u0103 sens atunci c\u00e2nd<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Timpul de sta\u021bionare este limitat<\/strong> (adesea &lt; 60 de minute), iar randamentul este indicatorul cheie de performan\u021b\u0103 (KPI).<\/li>\n\n\n\n<li>Po\u021bi conduce <strong>utilizare ridicat\u0103<\/strong>Activele din clasa MW se depreciaz\u0103 indiferent dac\u0103 sunt \u00een curs de \u00eenc\u0103rcare sau inactive.<\/li>\n\n\n\n<li>Pute\u021bi executa o comand\u0103 de domeniu \u00een amonte: <strong>Interconectare MT<\/strong>, timpi de livrare a transformatoarelor, coordonarea protec\u021biei \u0219i teste de acceptare a punerii \u00een func\u021biune.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">MCS este adesea o investi\u021bie proast\u0103 atunci c\u00e2nd<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Taxele de cerere sunt dominante \u0219i nu ave\u021bi nicio atenuare (de exemplu, <strong>BESS<\/strong>, managementul contractual al cererii, programare \u00een func\u021bie de v\u00e2rfuri). V\u00e2rfurile de consum din megawa\u021bi transform\u0103 \u201eevenimentele rare\u201d \u00een \u201eevenimente de facturare\u201d.<\/li>\n\n\n\n<li>Capacitatea re\u021belei este limitat\u0103, iar moderniz\u0103rile sunt incerte sau lente. Dac\u0103 lucr\u0103rile de interconectare \u00eent\u00e2rzie, hardware-ul MCS r\u0103m\u00e2ne inactiv.<\/li>\n\n\n\n<li>Preg\u0103tirea opera\u021bional\u0103 este imatur\u0103: f\u0103r\u0103 o mentenan\u021b\u0103 structurat\u0103, monitorizare \u0219i izolare a defec\u021biunilor, disponibilitatea nu va corespunde realit\u0103\u021bii.<\/li>\n<\/ul>\n\n\n\n<p><strong>Not\u0103 de la inginer:<\/strong>\u201eROI MCS slab\u201d nu este de obicei pentru c\u0103 1 MW este inutil. Ci pentru c\u0103 amplasamentul pl\u0103te\u0219te pentru 1 MW. <strong>chiar \u0219i atunci c\u00e2nd nu c\u00e2\u0219tig\u0103 din 1 MW<\/strong>\u2014prin taxe de cerere, capacitate inactiv\u0103 \u0219i costuri generale de \u00eentre\u021binere mai mari.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"1080\" src=\"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp\" alt=\"Solu\u021bie de \u00eenc\u0103rcare split DC pentru camioane electrice grele\" class=\"wp-image-36454\" srcset=\"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp 1080w, https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck-150x150.webp 150w, https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck-12x12.webp 12w, https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck-700x700.webp 700w, https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck-600x600.webp 600w, https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck-768x768.webp 768w\" sizes=\"auto, (max-width: 1080px) 100vw, 1080px\" \/><figcaption class=\"wp-element-caption\"><a href=\"https:\/\/www.evb.com\/ro\/by-vehicle-type\/electric-truck-charging\/\">EVB <strong>MCS<\/strong><\/a> <a href=\"https:\/\/www.evb.com\/ro\/by-vehicle-type\/electric-truck-charging\/\">Solu\u021bii de \u00eenc\u0103rcare a camioanelor<\/a><\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">3) MCS vs alte tipuri de \u00eenc\u0103rc\u0103toare (Compara\u021bie inginereasc\u0103 + comercial\u0103)<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>Dimensiune<\/strong><\/th><th><strong>MCS (Megawatt)<\/strong><\/th><th><strong><a href=\"https:\/\/www.evb.com\/ro\/by-charging-type\/evb-dc-ev-charging-solutions\/\">CCS DC Rapid<\/a><\/strong><\/th><th><strong>NACS DC Rapid<\/strong><\/th><th><strong><a href=\"https:\/\/www.evb.com\/ro\/evb-ac-ev-charging-solutions\/\">AC (Nivelul 2)<\/a><\/strong><\/th><\/tr><\/thead><tbody><tr><td>Cazuri de utilizare tipice<\/td><td>Camioane grele, depouri de mare capacitate, centre de coridoare<\/td><td>Coridoare pentru pasageri, flote care necesit\u0103 viraje mai rapide<\/td><td>Re\u021bele dependente de pia\u021b\u0103, extinz\u00e2ndu-se \u00een flot\u0103<\/td><td>Parcare la locul de munc\u0103, reziden\u021bial\u0103, pe termen lung<\/td><\/tr><tr><td>Interval de putere (practic)<\/td><td><strong>Sute de kW \u2192 clasa MW<\/strong> (dependent de amplasament)<\/td><td>~50\u2013350 kW tipic<\/td><td>Similar cu DC rapid (dependent de loca\u021bie)<\/td><td>~7\u201322 kW tipic<\/td><\/tr><tr><td>Cel mai bine c\u00e2nd<\/td><td><strong>Timp de sta\u021bionare &lt; 60 min<\/strong>, randamentul este KPI<\/td><td>Durat\u0103 de via\u021b\u0103 moderat\u0103, constr\u00e2ngeri flexibile<\/td><td>Compatibilitate cu ecosistemul + disponibilitate<\/td><td>Ore de sta\u021bionare, solicitare redus\u0103 a re\u021belei<\/td><\/tr><tr><td>Investi\u021bie proast\u0103 atunci c\u00e2nd<\/td><td>Taxele de cerere sunt dominante; utilizare sc\u0103zut\u0103; moderniz\u0103ri incerte ale sistemelor de medie tensiune<\/td><td>Concuren\u021b\u0103 ridicat\u0103 f\u0103r\u0103 partajare a puterii<\/td><td>Blocarea achizi\u021biilor \/ disponibilitate limitat\u0103<\/td><td>Necesit\u0103 o execu\u021bie rapid\u0103 \/ venituri din produc\u021bie<\/td><\/tr><tr><td>Cerin\u021be de re\u021bea<\/td><td>Adesea <strong>Interconectare MT<\/strong>transformatorul + tabloul de distribu\u021bie sunt critice<\/td><td>VS sau VM limitat\u0103, \u00een func\u021bie de scar\u0103<\/td><td>Similar cu DC rapid<\/td><td>\u00cen mare parte de joas\u0103 tensiune; cea mai simpl\u0103 interconectare<\/td><\/tr><tr><td>Constr\u00e2ngeri termice<\/td><td><strong>R\u0103cire cu lichid<\/strong> \u015fi <strong>reducerea termic\u0103 a puterii<\/strong> sunt centrale<\/td><td>Managementul termic conteaz\u0103<\/td><td>Similar cu DC rapid<\/td><td>Probleme termice minime<\/td><\/tr><tr><td>Motorul ROI<\/td><td><strong>Randament<\/strong> + conformitate cu SLA-urile pentru flot\u0103<\/td><td>Utilizare + marj\u0103 energetic\u0103<\/td><td>Acoperire + utilizare a re\u021belei<\/td><td>Capex de capital redus + taxare pe baz\u0103 de timp de a\u0219teptare<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1600\" src=\"https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915.jpeg\" alt=\"Seria de \u00eenc\u0103rc\u0103toare rapide EVB DC pentru aplica\u021bii publice \u0219i comerciale de \u00eenc\u0103rcare a vehiculelor electrice\" class=\"wp-image-38753\" srcset=\"https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915.jpeg 2560w, https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915-1536x960.jpeg 1536w, https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915-2048x1280.jpeg 2048w, https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915-18x12.jpeg 18w, https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915-600x375.jpeg 600w, https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915-768x480.jpeg 768w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><figcaption class=\"wp-element-caption\"><a href=\"https:\/\/www.evb.com\/ro\">EVB ofer\u0103 o gam\u0103 complet\u0103 de \u00eenc\u0103rc\u0103toare EV AC \u0219i DC<\/a><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">4) Restric\u021bii de implementare care de fapt \u00eencalc\u0103 site-urile MCS<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">4.1 R\u0103cire cu lichid \u0219i reducere termic\u0103 a puterii<\/h3>\n\n\n\n<p>La niveluri de curent din clasa MW, <strong>Pierderi I\u00b2R<\/strong>, cre\u0219terea rezisten\u021bei de contact \u0219i interfe\u021bele termice domin\u0103 performan\u021ba real\u0103. Chiar \u0219i \u00een cazul cablurilor r\u0103cite cu lichid, reducerea puterii este frecvent\u0103 odat\u0103 ce fluxul de lichid de r\u0103cire, schimbul de c\u0103ldur\u0103 sau calitatea contactului conectorului se modific\u0103.<\/p>\n\n\n\n<p>Realit\u0103\u021bi cheie:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Buclele de r\u0103cire devin o <strong>sistem de \u00eentre\u021binere<\/strong> (filtre, pompe, etan\u0219\u0103ri), nu o \u201ecaracteristic\u0103\u201d.<\/li>\n\n\n\n<li>Abaterea senzorilor poate declan\u0219a o reducere prematur\u0103 a puterii, masc\u00e2nd problemele reale p\u00e2n\u0103 la sc\u0103derea randamentului.<\/li>\n\n\n\n<li>Testele de acceptare trebuie s\u0103 includ\u0103 <strong>validare termic\u0103 la sarcin\u0103 sus\u021binut\u0103<\/strong>, nu doar explozii de v\u00e2rf.<\/li>\n<\/ul>\n\n\n\n<p><strong>Not\u0103 de la inginer:<\/strong>O reducere nea\u0219teptat\u0103 a puterii de \u00eenc\u0103lzire apare adesea din cauza unor efecte cumulative mici - restric\u021bii de debit, degradarea schimb\u0103torului de c\u0103ldur\u0103 \u0219i cre\u0219terea rezisten\u021bei de contact. Ad\u0103uga\u021bi un <strong>scanare termic\u0103 sub sarcin\u0103 sus\u021binut\u0103<\/strong> la testarea de acceptare.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4.2 Fiabilitatea opera\u021bional\u0103: uciga\u0219ul silen\u021bios al randamentului<\/h3>\n\n\n\n<p>\u00cen depozitele reale, cele mai mari defec\u021biuni ale randamentului provin adesea din opera\u021biuni, mai degrab\u0103 dec\u00e2t din puterea specificat\u0103: lacune \u00een punere \u00een func\u021biune, set\u0103ri de protec\u021bie, rutine de \u00eentre\u021binere incomplete \u0219i izolare lent\u0103 a defec\u021biunilor.<\/p>\n\n\n\n<p>Ce s\u0103 proiecta\u021bi:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Coordonarea protec\u021biei<\/strong> trebuie s\u0103 corespund\u0103 comportamentului rampei MW pentru a evita declan\u0219\u0103rile nedorite.<\/li>\n\n\n\n<li><strong>Strategia pieselor de schimb<\/strong> conteaz\u0103: loca\u021biile cu utilizare intens\u0103 au nevoie de piese de schimb critice \u0219i ferestre de service previzibile.<\/li>\n\n\n\n<li><strong>Monitorizarea disciplinei<\/strong> conteaz\u0103: ar trebui detectat\u0103 o mic\u0103 devia\u021bie termic\u0103 sau electric\u0103 \u00eenainte ca aceasta s\u0103 devin\u0103 o perioad\u0103 de nefunc\u021bionare.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">5) Arhitectura site-ului Grid-first (unde se investesc majoritatea banilor)<\/h2>\n\n\n\n<p>Depozitul de \u00eenc\u0103rcare pentru camioane electrice din 2026 necesit\u0103... <strong>mentalitatea de tip \u201egrid first\u201d<\/strong>Majoritatea implement\u0103rilor din clasa MW seam\u0103n\u0103 cu infrastructura industrial\u0103:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Re\u021bea de medie tensiune \u2192 Tablou de distribu\u021bie\/protec\u021bie de medie tensiune<\/li>\n\n\n\n<li>Transformator cobor\u0103tor (distribu\u021bie MT \u2192 JT)<\/li>\n\n\n\n<li>Coordonarea distribu\u021biei\/protec\u021biei de joas\u0103 tensiune<\/li>\n\n\n\n<li>Dulap(e) de alimentare CC<\/li>\n\n\n\n<li>Dozator(e) MCS<\/li>\n<\/ul>\n\n\n\n<p>Fragment de studiu de caz (anonimizat): Set\u0103rile de protec\u021bie pot distruge redresarea<\/p>\n\n\n\n<p>Un depozit pilot din 2025 nu a reu\u0219it s\u0103 \u00ee\u0219i ating\u0103 obiectivul de 30 de minute - nu din cauza \u00eenc\u0103rc\u0103toarelor, ci pentru c\u0103 <strong>set\u0103rile locale de protec\u021bie a re\u021belei au fost prea agresive<\/strong> la ini\u021biere la sarcin\u0103 mare. Decupl\u0103rile intempestive au for\u021bat reset\u0103ri manuale, reduc\u00e2nd debitul.<\/p>\n\n\n\n<p><strong>Lec\u0163ie:<\/strong> Valida\u021bi coordonarea protec\u021biei \u00een cadrul unor profile de ramp\u0103 realiste - nu doar \u00een teste de sarcin\u0103 \u00een regim sta\u021bionar.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">5.1 Calcul rapid al puterii (fezabilitate ini\u021bial\u0103)<\/h3>\n\n\n\n<p>Dac\u0103 un vehicul are nevoie de energie <strong>E.<\/strong> (kWh) livrat la timp <strong>t<\/strong> (ore), puterea medie este:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Text simplu: <strong>P_avg \u2248 E \/ t<\/strong><\/li>\n<\/ul>\n\n\n\n<p>Dac\u0103 site-ul dvs. are <strong>N<\/strong> tarabe cu factor de concuren\u021b\u0103 <strong>k<\/strong> (0\u20131) \u0219i \u021binta per stand <strong>P_stall<\/strong>, v\u00e2rful site-ului este:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Text simplu: <strong>P_v\u00e2rf \u2248 N \u00d7 k \u00d7 P_oprire<\/strong><\/li>\n<\/ul>\n\n\n\n<p><strong>Not\u0103 de la inginer:<\/strong>Nu alege\u021bi m\u0103rimea \u00een func\u021bie de \u201enum\u0103rul de dozatoare\u201d. M\u0103rimea \u00een func\u021bie de <strong>camioane simultane sub SLA<\/strong>Tarifele \u0219i transformatoarele \u00eenregistreaz\u0103 doar v\u00e2rfuri.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">6) Stiva de standarde (ceea ce conteaz\u0103 f\u0103r\u0103 a intra prea mult \u00een detalii)<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.evb.com\/ro\/iso-15118-the-complete-guide-to-ev-charging-communication-standards-2026-edition\/\">ISO 15118-20<\/a> sus\u021bine func\u021biile moderne de comunicare EV-EVSE \u0219i a\u0219tept\u0103rile de securitate pentru implement\u0103rile de genera\u021bie urm\u0103toare.<\/li>\n\n\n\n<li><a href=\"https:\/\/www.evb.com\/ro\/ocpp-standards-hub-ocpp-2-0-1-2-1-explained-ev-charging-guide\/\"><strong>OCPP 2.0.1<\/strong> <\/a>este din ce \u00een ce mai important\u0103 pentru opera\u021biunile scalabile: monitorizare, diagnosticare, actualiz\u0103ri \u0219i control al flotei.<\/li>\n\n\n\n<li><strong>SAE J3271<\/strong> ofer\u0103 un cadru tehnic pentru considera\u021biile privind echipamentele \u0219i sistemele MCS.<\/li>\n<\/ul>\n\n\n\n<p><strong>Not\u0103 de la inginer:<\/strong>Standardele nu garanteaz\u0103 randamentul. Argumentele dumneavoastr\u0103 economice const\u0103 \u00een func\u021bionare continu\u0103, coordonarea protec\u021biei, disciplina de mentenan\u021b\u0103 \u0219i gestionarea energiei \u00een func\u021bie de tarife.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">7) Logica deciziilor de implementare: MCS vs. CCS (\u0219i unde c\u00e2\u0219tig\u0103 hibridele)<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Un arbore decizional practic (versiune text)<\/h3>\n\n\n\n<ol start=\"1\" class=\"wp-block-list\">\n<li><strong>Timp de sta\u021bionare &lt; 60 de minute?<\/strong><\/li>\n<\/ol>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Da \u2192 MCS devine un candidat puternic (constr\u00e2ngere de randament).<\/li>\n\n\n\n<li>Nu \u2192 trece\u021bi la pasul 2.<\/li>\n<\/ul>\n\n\n\n<ol start=\"2\" class=\"wp-block-list\">\n<li><strong>Capacitatea re\u021belei este limitat\u0103 \/ moderniz\u0103rile sunt costisitoare sau lente?<\/strong><\/li>\n<\/ol>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Da \u2192 se favorizeaz\u0103 CCS + partajarea puterii \u0219i extinderea \u00een etape; se adaug\u0103 atenuarea emisiilor de v\u00e2rf acolo unde este necesar.<\/li>\n\n\n\n<li>Nu \u2192 trece\u021bi la pasul 3.<\/li>\n<\/ul>\n\n\n\n<ol start=\"3\" class=\"wp-block-list\">\n<li><strong>Este utilizarea ridicat\u0103 \u0219i previzibil\u0103?<\/strong><\/li>\n<\/ol>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Da \u2192 MCS se poate acoperi dac\u0103 se proiecteaz\u0103 un sistem de atenuare a timpului de func\u021bionare \u0219i a atenu\u0103rii v\u00e2rfurilor de activitate.<\/li>\n\n\n\n<li>Nu \u2192 MCS este probabil supradimensionat (investi\u021bii de capital inactive + penaliz\u0103ri pentru v\u00e2rfuri de activitate).<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Strategie hibrid\u0103 care func\u021bioneaz\u0103 bine \u00een 2026<\/h3>\n\n\n\n<p>Construi\u021bi moderniz\u0103ri bazate pe re\u021bea \u0219i pe faze: implementa\u021bi CCS cu energie partajat\u0103 acolo unde este cazul ast\u0103zi, rezerva\u021bi spa\u021biu \u0219i c\u0103i electrice pentru extinderea MCS pe m\u0103sur\u0103 ce gradul de utilizare se dovede\u0219te a fi mai bun.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">8) Teste de punere \u00een func\u021biune \u0219i acceptare (nu le trata\u021bi ca documente)<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Teste termice la sarcin\u0103 sus\u021binut\u0103 pentru validarea pragurilor de reducere a puterii \u00een condi\u021bii realiste<\/li>\n\n\n\n<li>Validarea coordon\u0103rii protec\u021biei \u00een condi\u021bii de comportament realist la ramp\u0103<\/li>\n\n\n\n<li>Exerci\u021bii de izolare a defec\u021biunilor pentru a confirma c\u0103 o singur\u0103 defec\u021biune nu duce la pr\u0103bu\u0219irea amplasamentului<\/li>\n\n\n\n<li>Preg\u0103tire pentru \u00eentre\u021binere: piese de schimb, ferestre de service \u0219i praguri de monitorizare definite \u00eenainte de punerea \u00een func\u021biune<\/li>\n<\/ul>\n\n\n\n<p><strong>Not\u0103 de la inginer:<\/strong>Dac\u0103 punerea \u00een func\u021biune nu include cel pu\u021bin o \u201esimulare a unei zile proaste\u201d (concuren\u021b\u0103 de v\u00e2rf + stres termic + recuperare dup\u0103 defec\u021biune), nu a\u021bi pus \u00een func\u021biune - a\u021bi doar instalat.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">9) List\u0103 de verificare pentru preg\u0103tirea implement\u0103rii (gata de publicare)<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Gril\u0103:<\/strong> Domeniul de aplicare al interconect\u0103rii de medie tensiune, timpii de livrare a transformatoarelor \u0219i coordonarea protec\u021biei validate<\/li>\n\n\n\n<li><strong>Termic:<\/strong> teste de sarcin\u0103 sus\u021binut\u0103 \u0219i criterii de acceptare definite; comportamentul de reducere a puterii \u00een\u021beles<\/li>\n\n\n\n<li><strong>Opera\u021biuni:<\/strong> fluxuri de lucru pentru monitorizare, piese de schimb \u0219i izolare a defec\u021biunilor, gata \u00eenainte de implementare<\/li>\n\n\n\n<li><strong>Comercial:<\/strong> expunerea la tarife \u00een\u021beleas\u0103; strategie de atenuare a v\u00e2rfurilor definit\u0103, dac\u0103 este necesar<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">10) Concluzia<\/h2>\n\n\n\n<p>MCS poate fi o arm\u0103 competitiv\u0103 \u00een 2026 - dar numai dac\u0103 o tratezi ca pe o <strong>re\u021bea + termic\u0103 + opera\u021biuni<\/strong> program, nu ca o actualizare a conectorului.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Dac\u0103 <strong>randament<\/strong> este indicatorul cheie de performan\u021b\u0103 (KPI), MCS poate fi justificat atunci c\u00e2nd gradul de utilizare este ridicat \u0219i timpul de func\u021bionare este proiectat.<\/li>\n\n\n\n<li>Dac\u0103 tarifele penalizeaz\u0103 v\u00e2rfurile de produc\u021bie \u0219i lipse\u0219te atenuarea, MCS-ul poate fi o modalitate costisitoare de a cump\u0103ra evenimente de v\u00e2rf.<\/li>\n\n\n\n<li>Dac\u0103 moderniz\u0103rile re\u021belei sunt incerte, planifica\u021bi etapele planului de ac\u021biune \u0219i evita\u021bi activele MW blocate.<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>MCS deployment in 2026 is not decided by connector ratings. It\u2019s decided by grid reality, thermal behavior, and operational uptime. This guide explains when MCS makes sense, when it is a bad investment, and what engineering work must happen upstream to avoid failure. 1) What MCS is (and what it isn\u2019t) What it is What [&hellip;]<\/p>","protected":false},"author":3,"featured_media":36454,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[165,164,161,163,162,160,166,126,147,169,167,168,170],"class_list":["post-38739","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-electric-truck-charging-depot","tag-heavy-duty-ev-charging","tag-iso-15118-20","tag-mcs-charging","tag-megawatt-charging-infrastructure","tag-megawatt-charging-system","tag-mv-interconnect","tag-ocpp-2-0-1","tag-ocsp-stapling","tag-pki-certificate-chains","tag-power-sharing","tag-sae-j3271","tag-thermal-de-rating"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Megawatt Charging System (MCS) Deployment in 2026: Grid, Thermal De-Rating &amp; ISO 15118-20 Reliability<\/title>\n<meta name=\"description\" content=\"A 2026 engineering guide to MCS deployment: grid-first MV interconnect planning, liquid-cooling thermal de-rating, and ISO 15118-20 TLS session reliability for heavy-duty EV depots and hubs.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.evb.com\/ro\/megawatt-charging-system-mcs-deployment-in-2026\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Megawatt Charging System (MCS) Deployment in 2026: Grid, Thermal De-Rating &amp; ISO 15118-20 Reliability\" \/>\n<meta property=\"og:description\" content=\"A 2026 engineering guide to MCS deployment: grid-first MV interconnect planning, liquid-cooling thermal de-rating, and ISO 15118-20 TLS session reliability for heavy-duty EV depots and hubs.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.evb.com\/ro\/megawatt-charging-system-mcs-deployment-in-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"EVB\" \/>\n<meta property=\"article:published_time\" content=\"2026-01-23T10:38:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-26T05:06:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"evb\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Scris de\" \/>\n\t<meta name=\"twitter:data1\" content=\"evb\" \/>\n\t<meta name=\"twitter:label2\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/\"},\"author\":{\"name\":\"evb\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/#\\\/schema\\\/person\\\/fe8f0137976034abdfd2ae4f8c5682d0\"},\"headline\":\"Megawatt Charging System (MCS) Deployment in 2026\",\"datePublished\":\"2026-01-23T10:38:38+00:00\",\"dateModified\":\"2026-01-26T05:06:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/\"},\"wordCount\":1271,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp\",\"keywords\":[\"Electric truck charging depot\",\"Heavy-duty EV charging\",\"ISO 15118-20\",\"MCS charging\",\"Megawatt charging infrastructure\",\"Megawatt Charging System\",\"MV interconnect\",\"OCPP 2.0.1\",\"OCSP Stapling\",\"PKI certificate chains\",\"Power sharing\",\"SAE J3271\",\"Thermal de-rating\"],\"articleSection\":[\"Blog\"],\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/\",\"url\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/\",\"name\":\"Megawatt Charging System (MCS) Deployment in 2026: Grid, Thermal De-Rating & ISO 15118-20 Reliability\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp\",\"datePublished\":\"2026-01-23T10:38:38+00:00\",\"dateModified\":\"2026-01-26T05:06:40+00:00\",\"description\":\"A 2026 engineering guide to MCS deployment: grid-first MV interconnect planning, liquid-cooling thermal de-rating, and ISO 15118-20 TLS session reliability for heavy-duty EV depots and hubs.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp\",\"contentUrl\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp\",\"width\":1080,\"height\":1080,\"caption\":\"split dc ev charging solution for electric heavy truck\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.evb.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Megawatt Charging System (MCS) Deployment in 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/#website\",\"url\":\"https:\\\/\\\/www.evb.com\\\/\",\"name\":\"EVB\",\"description\":\"Smart EV Charging &amp; Energy Storage Solutions\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.evb.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/#organization\",\"name\":\"EVB\",\"url\":\"https:\\\/\\\/www.evb.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/evb-3.png\",\"contentUrl\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/evb-3.png\",\"width\":605,\"height\":626,\"caption\":\"EVB\"},\"image\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/#\\\/schema\\\/person\\\/fe8f0137976034abdfd2ae4f8c5682d0\",\"name\":\"evb\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g\",\"caption\":\"evb\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Megawatt Charging System (MCS) Deployment in 2026: Grid, Thermal De-Rating & ISO 15118-20 Reliability","description":"A 2026 engineering guide to MCS deployment: grid-first MV interconnect planning, liquid-cooling thermal de-rating, and ISO 15118-20 TLS session reliability for heavy-duty EV depots and hubs.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.evb.com\/ro\/megawatt-charging-system-mcs-deployment-in-2026\/","og_locale":"ro_RO","og_type":"article","og_title":"Megawatt Charging System (MCS) Deployment in 2026: Grid, Thermal De-Rating & ISO 15118-20 Reliability","og_description":"A 2026 engineering guide to MCS deployment: grid-first MV interconnect planning, liquid-cooling thermal de-rating, and ISO 15118-20 TLS session reliability for heavy-duty EV depots and hubs.","og_url":"https:\/\/www.evb.com\/ro\/megawatt-charging-system-mcs-deployment-in-2026\/","og_site_name":"EVB","article_published_time":"2026-01-23T10:38:38+00:00","article_modified_time":"2026-01-26T05:06:40+00:00","og_image":[{"width":1080,"height":1080,"url":"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp","type":"image\/webp"}],"author":"evb","twitter_card":"summary_large_image","twitter_misc":{"Scris de":"evb","Timp estimat pentru citire":"6 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/#article","isPartOf":{"@id":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/"},"author":{"name":"evb","@id":"https:\/\/www.evb.com\/#\/schema\/person\/fe8f0137976034abdfd2ae4f8c5682d0"},"headline":"Megawatt Charging System (MCS) Deployment in 2026","datePublished":"2026-01-23T10:38:38+00:00","dateModified":"2026-01-26T05:06:40+00:00","mainEntityOfPage":{"@id":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/"},"wordCount":1271,"commentCount":0,"publisher":{"@id":"https:\/\/www.evb.com\/#organization"},"image":{"@id":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp","keywords":["Electric truck charging depot","Heavy-duty EV charging","ISO 15118-20","MCS charging","Megawatt charging infrastructure","Megawatt Charging System","MV interconnect","OCPP 2.0.1","OCSP Stapling","PKI certificate chains","Power sharing","SAE J3271","Thermal de-rating"],"articleSection":["Blog"],"inLanguage":"ro-RO","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/","url":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/","name":"Megawatt Charging System (MCS) Deployment in 2026: Grid, Thermal De-Rating & ISO 15118-20 Reliability","isPartOf":{"@id":"https:\/\/www.evb.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/#primaryimage"},"image":{"@id":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp","datePublished":"2026-01-23T10:38:38+00:00","dateModified":"2026-01-26T05:06:40+00:00","description":"A 2026 engineering guide to MCS deployment: grid-first MV interconnect planning, liquid-cooling thermal de-rating, and ISO 15118-20 TLS session reliability for heavy-duty EV depots and hubs.","breadcrumb":{"@id":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/"]}]},{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/#primaryimage","url":"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp","contentUrl":"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp","width":1080,"height":1080,"caption":"split dc ev charging solution for electric heavy truck"},{"@type":"BreadcrumbList","@id":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.evb.com\/"},{"@type":"ListItem","position":2,"name":"Megawatt Charging System (MCS) Deployment in 2026"}]},{"@type":"WebSite","@id":"https:\/\/www.evb.com\/#website","url":"https:\/\/www.evb.com\/","name":"EVB","description":"Smart EV Charging &amp; Energy Storage Solutions","publisher":{"@id":"https:\/\/www.evb.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.evb.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/www.evb.com\/#organization","name":"EVB","url":"https:\/\/www.evb.com\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/www.evb.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.evb.com\/wp-content\/uploads\/2021\/03\/evb-3.png","contentUrl":"https:\/\/www.evb.com\/wp-content\/uploads\/2021\/03\/evb-3.png","width":605,"height":626,"caption":"EVB"},"image":{"@id":"https:\/\/www.evb.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.evb.com\/#\/schema\/person\/fe8f0137976034abdfd2ae4f8c5682d0","name":"evb","image":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/secure.gravatar.com\/avatar\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g","caption":"evb"}}]}},"_links":{"self":[{"href":"https:\/\/www.evb.com\/ro\/wp-json\/wp\/v2\/posts\/38739","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.evb.com\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.evb.com\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.evb.com\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.evb.com\/ro\/wp-json\/wp\/v2\/comments?post=38739"}],"version-history":[{"count":19,"href":"https:\/\/www.evb.com\/ro\/wp-json\/wp\/v2\/posts\/38739\/revisions"}],"predecessor-version":[{"id":38776,"href":"https:\/\/www.evb.com\/ro\/wp-json\/wp\/v2\/posts\/38739\/revisions\/38776"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.evb.com\/ro\/wp-json\/wp\/v2\/media\/36454"}],"wp:attachment":[{"href":"https:\/\/www.evb.com\/ro\/wp-json\/wp\/v2\/media?parent=38739"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.evb.com\/ro\/wp-json\/wp\/v2\/categories?post=38739"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.evb.com\/ro\/wp-json\/wp\/v2\/tags?post=38739"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}