{"id":38739,"date":"2026-01-23T18:38:38","date_gmt":"2026-01-23T10:38:38","guid":{"rendered":"https:\/\/www.evb.com\/?p=38739"},"modified":"2026-01-26T13:06:40","modified_gmt":"2026-01-26T05:06:40","slug":"megawatt-charging-system-mcs-deployment-in-2026","status":"publish","type":"post","link":"https:\/\/www.evb.com\/tr\/megawatt-charging-system-mcs-deployment-in-2026\/","title":{"rendered":"2026 Y\u0131l\u0131nda Megawatt \u015earj Sistemi (MCS) Da\u011f\u0131t\u0131m\u0131"},"content":{"rendered":"<p><em>2026&#039;da MCS&#039;nin devreye al\u0131nmas\u0131, konekt\u00f6r de\u011ferlerine g\u00f6re de\u011fil, \u015febeke ger\u00e7ekli\u011fine, termal davran\u0131\u015fa ve operasyonel \u00e7al\u0131\u015fma s\u00fcresine g\u00f6re belirlenir. Bu k\u0131lavuz, MCS&#039;nin ne zaman mant\u0131kl\u0131 oldu\u011funu, ne zaman k\u00f6t\u00fc bir yat\u0131r\u0131m oldu\u011funu ve ar\u0131zay\u0131 \u00f6nlemek i\u00e7in yukar\u0131 ak\u0131\u015fta hangi m\u00fchendislik \u00e7al\u0131\u015fmalar\u0131n\u0131n yap\u0131lmas\u0131 gerekti\u011fini a\u00e7\u0131klamaktad\u0131r.<\/em><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">1) MCS nedir (ve ne de\u011fildir)<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Bu nedir?<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A\u011f\u0131r hizmet tipi DC \u015farj yakla\u015f\u0131m\u0131 <strong>MW s\u0131n\u0131f\u0131 g\u00fc\u00e7 aktar\u0131m\u0131<\/strong> Zaman k\u0131s\u0131tlamal\u0131 \u00e7al\u0131\u015fma d\u00f6ng\u00fcleri i\u00e7in (koridor merkezleri, y\u00fcksek verimli sahalar, depo d\u00f6n\u00fc\u015f s\u00fcreleri).<\/li>\n\n\n\n<li>Sistem d\u00fczeyinde bir y\u00fckseltme, k\u0131s\u0131tlamalar\u0131 yukar\u0131 do\u011fru itiyor: <strong>\u015febeke ba\u011flant\u0131s\u0131<\/strong>, <strong>koruma koordinasyonu<\/strong>, <strong>termal y\u00f6netim<\/strong>, Ve <strong>operasyon haz\u0131rl\u0131\u011f\u0131<\/strong>.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Bu, ne de\u011fildir?<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Her ara\u00e7 deposu i\u00e7in evrensel bir y\u00fckseltme de\u011fildir. Ara\u00e7lar geceyi orada ge\u00e7iriyorsa ve i\u015flem hacmi k\u0131s\u0131tlamalar\u0131 m\u00fctevaz\u0131ysa, <strong>Enerji payla\u015f\u0131m\u0131 ile CCS<\/strong> Genellikle toplam maliyet ve sadelik a\u00e7\u0131s\u0131ndan kazan\u0131r.<\/li>\n\n\n\n<li>Bu, &quot;kur ve unut&quot; tarz\u0131 bir kurulum de\u011fil. MW s\u0131n\u0131f\u0131 tesisler end\u00fcstriyel y\u00fckler gibi davran\u0131r: devreye alma, kabul testleri ve i\u015fletme disiplini, donan\u0131m kadar \u00f6nemlidir.<\/li>\n<\/ul>\n\n\n\n<p><strong>M\u00fchendisin Notu:<\/strong>Bir MCS program\u0131n\u0131 raydan \u00e7\u0131karman\u0131n en h\u0131zl\u0131 yolu, onu &quot;\u015farj cihaz\u0131 tedariki&quot; gibi ele almakt\u0131r. 2026&#039;da ise daha \u00e7ok bir sistemin devreye al\u0131nmas\u0131 gibi davranacakt\u0131r. <strong>trafo merkezine biti\u015fik end\u00fcstriyel y\u00fck<\/strong> Kesin \u00e7al\u0131\u015fma s\u00fcresi beklentileriyle.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">2) MCS ne zaman harika bir yat\u0131r\u0131md\u0131r ve ne zaman k\u00f6t\u00fc bir yat\u0131r\u0131md\u0131r?<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">MCS genellikle \u015fu durumlarda mant\u0131kl\u0131 gelir:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Kalma s\u00fcresi s\u0131n\u0131rl\u0131d\u0131r.<\/strong> (\u00e7o\u011fu zaman &lt; 60 dakika) ve verimlilik temel performans g\u00f6stergesidir.<\/li>\n\n\n\n<li>Araba kullanabilirsiniz. <strong>y\u00fcksek kullan\u0131m<\/strong>MW s\u0131n\u0131f\u0131 varl\u0131klar, \u015farj halindeyken veya bo\u015fta dururken amortismana tabidir.<\/li>\n\n\n\n<li>Yukar\u0131 ak\u0131\u015f kapsam\u0131n\u0131 \u00e7al\u0131\u015ft\u0131rabilirsiniz: <strong>MV ara ba\u011flant\u0131s\u0131<\/strong>Transformat\u00f6r teslim s\u00fcreleri, koruma koordinasyonu ve devreye alma kabul testleri.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">MCS, \u00e7o\u011fu zaman k\u00f6t\u00fc bir yat\u0131r\u0131md\u0131r.<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Talep \u00fccretleri bask\u0131n durumda ve herhangi bir hafifletme se\u00e7ene\u011finiz yok (\u00f6rne\u011fin, <strong>BESS<\/strong>(S\u00f6zle\u015fmeye dayal\u0131 talep y\u00f6netimi, zirveye duyarl\u0131 planlama). Megavat zirveleri, &quot;nadir olaylar\u0131&quot; &quot;faturaland\u0131rma olaylar\u0131na&quot; d\u00f6n\u00fc\u015ft\u00fcr\u00fcr.<\/li>\n\n\n\n<li>\u015eebeke kapasitesi s\u0131n\u0131rl\u0131 ve y\u00fckseltmeler belirsiz veya yava\u015f ilerliyor. Ba\u011flant\u0131 \u00e7al\u0131\u015fmalar\u0131 gecikirse, MCS donan\u0131m\u0131 at\u0131l durumda kal\u0131r.<\/li>\n\n\n\n<li>Operasyonel haz\u0131rl\u0131k yetersiz: Yap\u0131land\u0131r\u0131lm\u0131\u015f bak\u0131m, izleme ve ar\u0131za tespiti olmadan, kullan\u0131labilirlik i\u015f plan\u0131yla \u00f6rt\u00fc\u015fmeyecektir.<\/li>\n<\/ul>\n\n\n\n<p><strong>M\u00fchendisin Notu:<\/strong>&quot;K\u00f6t\u00fc MCS yat\u0131r\u0131m getirisi&quot; genellikle 1 MW&#039;\u0131n gereksiz olmas\u0131ndan kaynaklanmaz. Bunun nedeni, tesisin 1 MW&#039;l\u0131k enerji i\u00e7in \u00f6deme yapmas\u0131d\u0131r. <strong>1 MW&#039;tan gelir elde etmese bile<\/strong>\u2014talep \u00fccretleri, at\u0131l kapasite ve daha y\u00fcksek bak\u0131m giderleri yoluyla.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"1080\" src=\"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp\" alt=\"elektrikli a\u011f\u0131r kamyonlar i\u00e7in b\u00f6l\u00fcnm\u00fc\u015f dc ev \u015farj \u00e7\u00f6z\u00fcm\u00fc\" class=\"wp-image-36454\" srcset=\"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp 1080w, https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck-150x150.webp 150w, https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck-12x12.webp 12w, https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck-700x700.webp 700w, https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck-600x600.webp 600w, https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck-768x768.webp 768w\" sizes=\"auto, (max-width: 1080px) 100vw, 1080px\" \/><figcaption class=\"wp-element-caption\"><a href=\"https:\/\/www.evb.com\/tr\/by-vehicle-type\/electric-truck-charging\/\">EVB <strong>MCS<\/strong><\/a> <a href=\"https:\/\/www.evb.com\/tr\/by-vehicle-type\/electric-truck-charging\/\">Kamyon \u015farj \u00e7\u00f6z\u00fcmleri<\/a><\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">3) MCS ile di\u011fer \u015farj cihaz\u0131 t\u00fcrlerinin kar\u015f\u0131la\u015ft\u0131r\u0131lmas\u0131 (M\u00fchendislik + Ticari Kar\u015f\u0131la\u015ft\u0131rma)<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>Boyut<\/strong><\/th><th><strong>MCS (Megawatt)<\/strong><\/th><th><strong><a href=\"https:\/\/www.evb.com\/tr\/by-charging-type\/evb-dc-ev-charging-solutions\/\">CCS DC H\u0131zl\u0131<\/a><\/strong><\/th><th><strong>NACS DC H\u0131zl\u0131<\/strong><\/th><th><strong><a href=\"https:\/\/www.evb.com\/tr\/evb-ac-ev-charging-solutions\/\">AC (Seviye 2)<\/a><\/strong><\/th><\/tr><\/thead><tbody><tr><td>Tipik kullan\u0131m \u00f6rnekleri<\/td><td>A\u011f\u0131r y\u00fck kamyonlar\u0131, y\u00fcksek kapasiteli depolar, koridor merkezleri<\/td><td>Yolcu koridorlar\u0131, daha h\u0131zl\u0131 d\u00f6n\u00fc\u015flere ihtiya\u00e7 duyan filolar<\/td><td>Pazara ba\u011f\u0131ml\u0131 a\u011flar, filo yap\u0131s\u0131na do\u011fru geni\u015fliyor.<\/td><td>\u0130\u015fyeri, konut, uzun s\u00fcreli park yeri<\/td><\/tr><tr><td>G\u00fc\u00e7 aral\u0131\u011f\u0131 (pratik)<\/td><td><strong>Y\u00fczlerce kW \u2192 MW s\u0131n\u0131f\u0131<\/strong> (konuma ba\u011fl\u0131)<\/td><td>~50\u2013350 kW tipik<\/td><td>DC h\u0131zl\u0131ya benzer (konuma ba\u011fl\u0131)<\/td><td>~7\u201322 kW tipik<\/td><\/tr><tr><td>En iyi zaman<\/td><td><strong>Bekleme s\u00fcresi &lt; 60 dk<\/strong>Verimlilik, temel performans g\u00f6stergesidir (KPI).<\/td><td>Orta d\u00fczeyde i\u015flem s\u00fcresi, esnek k\u0131s\u0131tlamalar<\/td><td>Ekosistem uyumlulu\u011fu + bulunabilirlik<\/td><td>Bekleme s\u00fcresi saatleri, d\u00fc\u015f\u00fck \u015febeke gerilimi<\/td><\/tr><tr><td>K\u00f6t\u00fc yat\u0131r\u0131m<\/td><td>Talep \u00fccretleri bask\u0131n; d\u00fc\u015f\u00fck kullan\u0131m oran\u0131; orta gerilim hatt\u0131 y\u00fckseltmelerinde belirsizlik.<\/td><td>G\u00fc\u00e7 payla\u015f\u0131m\u0131 olmadan y\u00fcksek e\u015fzamanl\u0131l\u0131k<\/td><td>Tedarik k\u0131s\u0131tlamas\u0131 \/ s\u0131n\u0131rl\u0131 bulunabilirlik<\/td><td>H\u0131zl\u0131 i\u015flem hacmi\/gelir art\u0131\u015f\u0131 gerekiyor.<\/td><\/tr><tr><td>\u015eebeke gereksinimleri<\/td><td>S\u0131kl\u0131kla <strong>MV ara ba\u011flant\u0131s\u0131<\/strong>; transformat\u00f6r + \u015falt cihazlar\u0131 kritik \u00f6neme sahiptir.<\/td><td>\u00d6l\u00e7e\u011fe ba\u011fl\u0131 olarak LV veya s\u0131n\u0131rl\u0131 MV<\/td><td>DC h\u0131zl\u0131ya benzer<\/td><td>\u00c7o\u011funlukla LV; en basit ara ba\u011flant\u0131<\/td><\/tr><tr><td>Termal k\u0131s\u0131tlamalar<\/td><td><strong>S\u0131v\u0131 so\u011futma<\/strong> Ve <strong>termal de\u015farj<\/strong> merkezidir<\/td><td>Is\u0131 y\u00f6netimi \u00f6nemlidir.<\/td><td>DC h\u0131zl\u0131ya benzer<\/td><td>Minimum termal sorunlar<\/td><\/tr><tr><td>ROI s\u00fcr\u00fcc\u00fcs\u00fc<\/td><td><strong>Verim<\/strong> + filo SLA uyumlulu\u011fu<\/td><td>Kullan\u0131m + enerji marj\u0131<\/td><td>A\u011f eri\u015fimi + kullan\u0131m<\/td><td>D\u00fc\u015f\u00fck sermaye harcamas\u0131 + bekleme s\u00fcresine dayal\u0131 \u015farj<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1600\" src=\"https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915.jpeg\" alt=\"EVB DC h\u0131zl\u0131 \u015farj cihaz\u0131 serisi, kamu ve ticari elektrikli ara\u00e7 \u015farj uygulamalar\u0131 i\u00e7in tasarlanm\u0131\u015ft\u0131r.\" class=\"wp-image-38753\" srcset=\"https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915.jpeg 2560w, https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915-1536x960.jpeg 1536w, https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915-2048x1280.jpeg 2048w, https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915-18x12.jpeg 18w, https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915-600x375.jpeg 600w, https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915-768x480.jpeg 768w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><figcaption class=\"wp-element-caption\"><a href=\"https:\/\/www.evb.com\/tr\">EVB, geni\u015f bir yelpazede AC ve DC elektrikli ara\u00e7 \u015farj cihazlar\u0131 sunmaktad\u0131r.<\/a><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">4) MCS sitelerini fiilen bozan da\u011f\u0131t\u0131m k\u0131s\u0131tlamalar\u0131<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">4.1 S\u0131v\u0131 so\u011futma ve termal kapasite d\u00fc\u015f\u00fcrme<\/h3>\n\n\n\n<p>MW s\u0131n\u0131f\u0131 ak\u0131m seviyelerinde, <strong>I\u00b2R kay\u0131plar\u0131<\/strong>Temas direnci art\u0131\u015f\u0131 ve termal aray\u00fczler ger\u00e7ek performans\u0131 belirler. S\u0131v\u0131 so\u011futmal\u0131 kablolarda bile, so\u011futma s\u0131v\u0131s\u0131 ak\u0131\u015f\u0131, \u0131s\u0131 al\u0131\u015fveri\u015fi veya konekt\u00f6r temas kalitesinde sapmalar oldu\u011funda performans d\u00fc\u015f\u00fc\u015f\u00fc yayg\u0131nd\u0131r.<\/p>\n\n\n\n<p>Temel ger\u00e7ekler:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>So\u011futma devreleri bir hale gelir. <strong>bak\u0131m sistemi<\/strong> (filtreler, pompalar, contalar), bir &quot;\u00f6zellik&quot; de\u011fil.<\/li>\n\n\n\n<li>Sens\u00f6r sapmas\u0131, ger\u00e7ek sorunlar\u0131 gizleyerek verimin \u00e7\u00f6kmesine yol a\u00e7an erken performans d\u00fc\u015f\u00fc\u015f\u00fcne neden olabilir.<\/li>\n\n\n\n<li>Kabul testleri \u015funlar\u0131 i\u00e7ermelidir: <strong>s\u00fcrekli y\u00fck termal do\u011frulama<\/strong>Sadece en y\u00fcksek patlamalar de\u011fil.<\/li>\n<\/ul>\n\n\n\n<p><strong>M\u00fchendisin Notu:<\/strong>Beklenmedik performans d\u00fc\u015f\u00fc\u015fleri genellikle k\u00fc\u00e7\u00fck birikimli etkilerden kaynaklan\u0131r: ak\u0131\u015f k\u0131s\u0131tlamalar\u0131, \u0131s\u0131 e\u015fanj\u00f6r\u00fcn\u00fcn bozulmas\u0131 ve artan temas direnci. Buna bir de \u015funu ekleyin: <strong>S\u00fcrekli y\u00fck alt\u0131nda termal g\u00f6r\u00fcnt\u00fcleme taramas\u0131<\/strong> Kabul testine.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4.2 Operasyonel g\u00fcvenilirlik: sessiz verimlilik katili<\/h3>\n\n\n\n<p>Ger\u00e7ek depolarda, en b\u00fcy\u00fck verim kay\u0131plar\u0131 genellikle nominal g\u00fc\u00e7ten ziyade operasyonel nedenlerden kaynaklan\u0131r: devreye alma eksiklikleri, koruma ayarlar\u0131, eksik bak\u0131m rutinleri ve yava\u015f ar\u0131za tespiti.<\/p>\n\n\n\n<p>M\u00fchendislik \u00e7al\u0131\u015fmalar\u0131:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Koruma koordinasyonu<\/strong> Gereksiz ar\u0131zalar\u0131 \u00f6nlemek i\u00e7in MW rampas\u0131n\u0131n davran\u0131\u015f\u0131yla uyumlu olmal\u0131d\u0131r.<\/li>\n\n\n\n<li><strong>Yedek par\u00e7a stratejisi<\/strong> \u00d6nemli noktalar: Y\u00fcksek kullan\u0131m oran\u0131na sahip tesisler, kritik yedek par\u00e7alara ve \u00f6ng\u00f6r\u00fclebilir servis aral\u0131klar\u0131na ihtiya\u00e7 duyar.<\/li>\n\n\n\n<li><strong>Disiplin izleme<\/strong> \u00d6nemli noktalar: Ar\u0131za s\u00fcresine yol a\u00e7madan \u00f6nce k\u00fc\u00e7\u00fck termal veya elektriksel sapmalar tespit edilmelidir.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">5) Izgara \u00f6ncelikli site mimarisi (paran\u0131n b\u00fcy\u00fck k\u0131sm\u0131 buraya gidiyor)<\/h2>\n\n\n\n<p>2026 y\u0131l\u0131 i\u00e7in elektrikli kamyon \u015farj istasyonunun gereksinimleri \u015funlard\u0131r: <strong>\u015febeke \u00f6ncelikli zihniyet<\/strong>\u00c7o\u011fu MW s\u0131n\u0131f\u0131 kurulum, end\u00fcstriyel altyap\u0131ya benzer:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>MV \u015eebekesi \u2192 MV \u015falt cihazlar\u0131\/koruma sistemleri<\/li>\n\n\n\n<li>Al\u00e7alt\u0131c\u0131 transformat\u00f6r (Orta Gerilim \u2192 Al\u00e7ak Gerilim da\u011f\u0131t\u0131m\u0131)<\/li>\n\n\n\n<li>LV da\u011f\u0131t\u0131m\/koruma koordinasyonu<\/li>\n\n\n\n<li>DC g\u00fc\u00e7 kabini(leri)<\/li>\n\n\n\n<li>MCS da\u011f\u0131t\u0131c\u0131(lar)<\/li>\n<\/ul>\n\n\n\n<p>Vaka \u0130ncelemesinden Bir Kesit (Anonimle\u015ftirilmi\u015f): Koruma Ayarlar\u0131 \u0130\u015flem S\u00fcresini \u00d6ld\u00fcrebilir<\/p>\n\n\n\n<p>2025 pilot deposu, 30 dakikal\u0131k hedefine ula\u015famad\u0131; bunun nedeni \u015farj cihazlar\u0131 de\u011fil, ba\u015fka bir sebepti. <strong>Yerel \u015febeke koruma ayarlar\u0131 \u00e7ok agresifti.<\/strong> Y\u00fcksek y\u00fck alt\u0131nda ba\u015flatma s\u0131ras\u0131nda meydana gelen istenmeyen ar\u0131zalar, manuel s\u0131f\u0131rlamalar\u0131 zorunlu k\u0131larak verimlili\u011fi d\u00fc\u015f\u00fcrd\u00fc.<\/p>\n\n\n\n<p><strong>Ders:<\/strong> Koruma koordinasyonunu yaln\u0131zca sabit durum y\u00fck testlerinde de\u011fil, ger\u00e7ek\u00e7i rampa profilleri alt\u0131nda da do\u011frulay\u0131n.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">5.1 H\u0131zl\u0131 g\u00fc\u00e7 hesaplamas\u0131 (erken fizibilite)<\/h3>\n\n\n\n<p>Bir arac\u0131n enerjiye ihtiyac\u0131 varsa <strong>E<\/strong> (kWh) zaman\u0131nda teslim edildi <strong>T<\/strong> (saat), ortalama g\u00fc\u00e7 \u015f\u00f6yledir:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>D\u00fcz metin: <strong>P_avg \u2248 E \/ t<\/strong><\/li>\n<\/ul>\n\n\n\n<p>Sitenizde varsa <strong>N<\/strong> e\u015fzamanl\u0131l\u0131k fakt\u00f6r\u00fcne sahip duraklar <strong>k<\/strong> (0\u20131) ve durak ba\u015f\u0131na hedef <strong>P_stall<\/strong>Site zirvesi \u015f\u00f6yledir:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>D\u00fcz metin: <strong>P_peak \u2248 N \u00d7 k \u00d7 P_stall<\/strong><\/li>\n<\/ul>\n\n\n\n<p><strong>M\u00fchendisin Notu:<\/strong>&quot;Ka\u00e7 adet da\u011f\u0131t\u0131c\u0131ya ihtiya\u00e7 var&quot; diye d\u00fc\u015f\u00fcnerek boyutland\u0131rma yapmay\u0131n. Boyutland\u0131rmay\u0131 \u015fu kriterlere g\u00f6re yap\u0131n: <strong>SLA kapsam\u0131ndaki e\u015f zamanl\u0131 kamyonlar<\/strong>Tarifeler ve transformat\u00f6rler yaln\u0131zca zirve noktalar\u0131n\u0131 g\u00f6r\u00fcr.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">6) Standartlar s\u0131ralamas\u0131 (\u00e7ok detaya girmeden \u00f6nemli noktalar)<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.evb.com\/tr\/iso-15118-the-complete-guide-to-ev-charging-communication-standards-2026-edition\/\">ISO 15118-20<\/a> Yeni nesil uygulamalar i\u00e7in modern EV\u2013EVSE ileti\u015fim \u00f6zelliklerini ve g\u00fcvenlik beklentilerini destekler.<\/li>\n\n\n\n<li><a href=\"https:\/\/www.evb.com\/tr\/ocpp-standards-hub-ocpp-2-0-1-2-1-explained-ev-charging-guide\/\"><strong>OCPP 2.0.1<\/strong> <\/a>\u00d6l\u00e7eklenebilir operasyonlar i\u00e7in izleme, te\u015fhis, g\u00fcncellemeler ve filo kontrolleri giderek daha \u00f6nemli hale geliyor.<\/li>\n\n\n\n<li><strong>SAE J3271<\/strong> MCS ekipman\u0131 ve sistem hususlar\u0131 i\u00e7in teknik bir \u00e7er\u00e7eve sunar.<\/li>\n<\/ul>\n\n\n\n<p><strong>M\u00fchendisin Notu:<\/strong>Standartlar veri aktar\u0131m h\u0131z\u0131n\u0131 garanti etmez. \u0130\u015fletmenizin ba\u015far\u0131s\u0131, kesintisiz \u00e7al\u0131\u015fma s\u00fcresine, koruma koordinasyonuna, bak\u0131m disiplinine ve tarifeye duyarl\u0131 enerji y\u00f6netimine dayan\u0131r.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">7) Da\u011f\u0131t\u0131m karar mant\u0131\u011f\u0131: MCS ve CCS (ve hibritlerin avantaj sa\u011flad\u0131\u011f\u0131 noktalar)<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Pratik bir karar a\u011fac\u0131 (metin versiyonu)<\/h3>\n\n\n\n<ol start=\"1\" class=\"wp-block-list\">\n<li><strong>Bekleme s\u00fcresi 60 dakikadan az m\u0131?<\/strong><\/li>\n<\/ol>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Evet \u2192 MCS g\u00fc\u00e7l\u00fc bir aday haline geliyor (verimlilik k\u0131s\u0131tlamas\u0131).<\/li>\n\n\n\n<li>Hay\u0131r \u2192 2. ad\u0131ma ge\u00e7in.<\/li>\n<\/ul>\n\n\n\n<ol start=\"2\" class=\"wp-block-list\">\n<li><strong>\u015eebeke kapasitesi s\u0131n\u0131rl\u0131 m\u0131 \/ y\u00fckseltmeler pahal\u0131 veya yava\u015f m\u0131?<\/strong><\/li>\n<\/ol>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Evet \u2192 Karbon yakalama ve depolama (CCS) + enerji payla\u015f\u0131m\u0131 ve kademeli geni\u015flemeyi destekleyin; gerekti\u011finde tepe y\u00fck azaltma \u00f6nlemleri ekleyin.<\/li>\n\n\n\n<li>Hay\u0131r \u2192 3. ad\u0131ma ge\u00e7in.<\/li>\n<\/ul>\n\n\n\n<ol start=\"3\" class=\"wp-block-list\">\n<li><strong>Kullan\u0131m oran\u0131 y\u00fcksek ve \u00f6ng\u00f6r\u00fclebilir mi?<\/strong><\/li>\n<\/ol>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Evet \u2192 \u00c7al\u0131\u015fma s\u00fcresini ve ani y\u00fck azaltmay\u0131 optimize ederseniz MCS karl\u0131 olabilir.<\/li>\n\n\n\n<li>Hay\u0131r \u2192 MCS muhtemelen gere\u011finden fazla in\u015fa edilmi\u015f durumda (at\u0131l sermaye harcamalar\u0131 + zirve d\u00f6nem cezalar\u0131).<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">2026&#039;da iyi sonu\u00e7 verecek hibrit strateji<\/h3>\n\n\n\n<p>\u015eebekeye \u00f6ncelik vererek a\u015famal\u0131 iyile\u015ftirmeler yap\u0131n: bug\u00fcn uygun oldu\u011fu yerlerde payla\u015f\u0131ml\u0131 g\u00fc\u00e7le \u00e7al\u0131\u015fan karbon yakalama ve depolama (CCS) sistemlerini devreye al\u0131n, kullan\u0131m verimlili\u011fi kan\u0131tland\u0131k\u00e7a MCS geni\u015flemesi i\u00e7in yer ve elektrik hatlar\u0131 ay\u0131r\u0131n.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">8) Devreye alma ve kabul testleri (bunlar\u0131 sadece evrak i\u015fi olarak g\u00f6rmeyin)<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Ger\u00e7ek\u00e7i ko\u015fullar alt\u0131nda g\u00fc\u00e7 d\u00fc\u015f\u00fcrme e\u015fiklerini do\u011frulamak i\u00e7in s\u00fcrekli y\u00fck alt\u0131nda termal testler.<\/li>\n\n\n\n<li>Ger\u00e7ek\u00e7i rampa davran\u0131\u015f\u0131 alt\u0131nda koruma koordinasyonunun do\u011frulanmas\u0131<\/li>\n\n\n\n<li>Ar\u0131za tespiti tatbikatlar\u0131, tek bir ar\u0131zan\u0131n tesisin \u00e7\u00f6kmesine neden olmayaca\u011f\u0131n\u0131 do\u011frulamak i\u00e7in yap\u0131l\u0131r.<\/li>\n\n\n\n<li>Bak\u0131m haz\u0131rl\u0131\u011f\u0131: devreye alma \u00f6ncesinde yedek par\u00e7alar, servis aral\u0131klar\u0131 ve izleme e\u015fikleri tan\u0131mlanm\u0131\u015ft\u0131r.<\/li>\n<\/ul>\n\n\n\n<p><strong>M\u00fchendisin Notu:<\/strong>Devreye alma i\u015flemi en az bir &quot;k\u00f6t\u00fc g\u00fcn sim\u00fclasyonu&quot; (en y\u00fcksek e\u015fzamanl\u0131l\u0131k + termal stres + ar\u0131za giderme) i\u00e7ermiyorsa, devreye alma i\u015flemi ger\u00e7ekle\u015fmemi\u015ftir; sadece kurulum yap\u0131lm\u0131\u015ft\u0131r.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">9) Da\u011f\u0131t\u0131ma haz\u0131rl\u0131k kontrol listesi (yay\u0131nlamaya haz\u0131r)<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Izgara:<\/strong> MV ara ba\u011flant\u0131 kapsam\u0131, transformat\u00f6r teslim s\u00fcreleri ve koruma koordinasyonu do\u011fruland\u0131.<\/li>\n\n\n\n<li><strong>Termal:<\/strong> S\u00fcrekli y\u00fck testleri ve kabul kriterleri tan\u0131mland\u0131; performans d\u00fc\u015f\u00fcrme davran\u0131\u015f\u0131 anla\u015f\u0131ld\u0131.<\/li>\n\n\n\n<li><strong>\u0130\u015flemler:<\/strong> Devreye alma i\u015fleminden \u00f6nce izleme, yedek par\u00e7a ve ar\u0131za giderme i\u015f ak\u0131\u015flar\u0131 haz\u0131r durumda.<\/li>\n\n\n\n<li><strong>Reklam:<\/strong> Tarife riskine ili\u015fkin anlay\u0131\u015f olu\u015fturuldu; gerekirse zirve azaltma stratejisi tan\u0131mland\u0131.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">10) \u00d6zetle<\/h2>\n\n\n\n<p>MCS, 2026&#039;da rekabet\u00e7i bir silah olabilir; ancak bunu yaln\u0131zca ona \u015fu \u015fekilde yakla\u015f\u0131rsan\u0131z ba\u015farabilirsiniz: <strong>\u015febeke + termal + operasyonlar<\/strong> program olarak, ba\u011flant\u0131 y\u00fckseltmesi olarak de\u011fil.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>E\u011fer <strong>verimlilik<\/strong> KPI&#039;n\u0131z buysa, kullan\u0131m oran\u0131 y\u00fcksek ve \u00e7al\u0131\u015fma s\u00fcresi optimize edilmi\u015f oldu\u011funda MCS&#039;nin uygulanmas\u0131 hakl\u0131 g\u00f6r\u00fclebilir.<\/li>\n\n\n\n<li>Tarifeler zirve d\u00f6nemlerini cezaland\u0131r\u0131yorsa ve azaltma \u00f6nlemleri yoksa, MCS (Makine Kontrol Sistemi) zirve d\u00f6nemlerini sat\u0131n alman\u0131n pahal\u0131 bir yolu olabilir.<\/li>\n\n\n\n<li>\u015eebeke iyile\u015ftirmeleri belirsizse, yol haritan\u0131z\u0131 a\u015famaland\u0131r\u0131n ve at\u0131l durumda kalan MW varl\u0131klar\u0131ndan ka\u00e7\u0131n\u0131n.<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>2026&#039;da MCS&#039;nin devreye al\u0131nmas\u0131, konekt\u00f6r derecelendirmelerine g\u00f6re de\u011fil, \u015febeke ger\u00e7ekli\u011fine, termal davran\u0131\u015fa ve operasyonel \u00e7al\u0131\u015fma s\u00fcresine g\u00f6re belirlenir. Bu k\u0131lavuz, MCS&#039;nin ne zaman mant\u0131kl\u0131 oldu\u011funu, ne zaman k\u00f6t\u00fc bir yat\u0131r\u0131m oldu\u011funu ve ar\u0131zay\u0131 \u00f6nlemek i\u00e7in yukar\u0131 ak\u0131\u015fta hangi m\u00fchendislik \u00e7al\u0131\u015fmalar\u0131n\u0131n yap\u0131lmas\u0131 gerekti\u011fini a\u00e7\u0131klamaktad\u0131r. 1) MCS nedir (ve ne de\u011fildir) Ne oldu\u011fu Ne [\u2026]<\/p>","protected":false},"author":3,"featured_media":36454,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[165,164,161,163,162,160,166,126,147,169,167,168,170],"class_list":["post-38739","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-electric-truck-charging-depot","tag-heavy-duty-ev-charging","tag-iso-15118-20","tag-mcs-charging","tag-megawatt-charging-infrastructure","tag-megawatt-charging-system","tag-mv-interconnect","tag-ocpp-2-0-1","tag-ocsp-stapling","tag-pki-certificate-chains","tag-power-sharing","tag-sae-j3271","tag-thermal-de-rating"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Megawatt Charging System (MCS) Deployment in 2026: Grid, Thermal De-Rating &amp; ISO 15118-20 Reliability<\/title>\n<meta name=\"description\" content=\"A 2026 engineering guide to MCS deployment: grid-first MV interconnect planning, liquid-cooling thermal de-rating, and ISO 15118-20 TLS session reliability for heavy-duty EV depots and hubs.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.evb.com\/tr\/megawatt-charging-system-mcs-deployment-in-2026\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Megawatt Charging System (MCS) Deployment in 2026: Grid, Thermal De-Rating &amp; ISO 15118-20 Reliability\" \/>\n<meta property=\"og:description\" content=\"A 2026 engineering guide to MCS deployment: grid-first MV interconnect planning, liquid-cooling thermal de-rating, and ISO 15118-20 TLS session reliability for heavy-duty EV depots and hubs.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.evb.com\/tr\/megawatt-charging-system-mcs-deployment-in-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"EVB\" \/>\n<meta property=\"article:published_time\" content=\"2026-01-23T10:38:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-26T05:06:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"EVB Editorial Team\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"EVB Editorial Team\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/\"},\"author\":{\"name\":\"EVB Editorial Team\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/#\\\/schema\\\/person\\\/fe8f0137976034abdfd2ae4f8c5682d0\"},\"headline\":\"Megawatt Charging System (MCS) Deployment in 2026\",\"datePublished\":\"2026-01-23T10:38:38+00:00\",\"dateModified\":\"2026-01-26T05:06:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/\"},\"wordCount\":1271,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp\",\"keywords\":[\"Electric truck charging depot\",\"Heavy-duty EV charging\",\"ISO 15118-20\",\"MCS charging\",\"Megawatt charging infrastructure\",\"Megawatt Charging System\",\"MV interconnect\",\"OCPP 2.0.1\",\"OCSP Stapling\",\"PKI certificate chains\",\"Power sharing\",\"SAE J3271\",\"Thermal de-rating\"],\"articleSection\":[\"Blog\"],\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/\",\"url\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/\",\"name\":\"Megawatt Charging System (MCS) Deployment in 2026: Grid, Thermal De-Rating & ISO 15118-20 Reliability\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp\",\"datePublished\":\"2026-01-23T10:38:38+00:00\",\"dateModified\":\"2026-01-26T05:06:40+00:00\",\"description\":\"A 2026 engineering guide to MCS deployment: grid-first MV interconnect planning, liquid-cooling thermal de-rating, and ISO 15118-20 TLS session reliability for heavy-duty EV depots and hubs.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp\",\"contentUrl\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp\",\"width\":1080,\"height\":1080,\"caption\":\"split dc ev charging solution for electric heavy truck\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/megawatt-charging-system-mcs-deployment-in-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.evb.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Megawatt Charging System (MCS) Deployment in 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/#website\",\"url\":\"https:\\\/\\\/www.evb.com\\\/\",\"name\":\"EVB\",\"description\":\"Smart EV Charging &amp; Energy Storage Solutions\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.evb.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/#organization\",\"name\":\"EVB\",\"url\":\"https:\\\/\\\/www.evb.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/evb-3.png\",\"contentUrl\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/evb-3.png\",\"width\":605,\"height\":626,\"caption\":\"EVB\"},\"image\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/#\\\/schema\\\/person\\\/fe8f0137976034abdfd2ae4f8c5682d0\",\"name\":\"EVB Editorial Team\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g\",\"caption\":\"EVB Editorial Team\"},\"description\":\"The EVB Editorial Team creates expert content on EV charging infrastructure, commercial charging solutions, energy storage integration, and global charging projects, with input from EVB product and engineering specialists.\",\"sameAs\":[\"https:\\\/\\\/www.evb.com\\\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Megawatt Charging System (MCS) Deployment in 2026: Grid, Thermal De-Rating & ISO 15118-20 Reliability","description":"A 2026 engineering guide to MCS deployment: grid-first MV interconnect planning, liquid-cooling thermal de-rating, and ISO 15118-20 TLS session reliability for heavy-duty EV depots and hubs.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.evb.com\/tr\/megawatt-charging-system-mcs-deployment-in-2026\/","og_locale":"tr_TR","og_type":"article","og_title":"Megawatt Charging System (MCS) Deployment in 2026: Grid, Thermal De-Rating & ISO 15118-20 Reliability","og_description":"A 2026 engineering guide to MCS deployment: grid-first MV interconnect planning, liquid-cooling thermal de-rating, and ISO 15118-20 TLS session reliability for heavy-duty EV depots and hubs.","og_url":"https:\/\/www.evb.com\/tr\/megawatt-charging-system-mcs-deployment-in-2026\/","og_site_name":"EVB","article_published_time":"2026-01-23T10:38:38+00:00","article_modified_time":"2026-01-26T05:06:40+00:00","og_image":[{"width":1080,"height":1080,"url":"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp","type":"image\/webp"}],"author":"EVB Editorial Team","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"EVB Editorial Team","Tahmini okuma s\u00fcresi":"6 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/#article","isPartOf":{"@id":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/"},"author":{"name":"EVB Editorial Team","@id":"https:\/\/www.evb.com\/#\/schema\/person\/fe8f0137976034abdfd2ae4f8c5682d0"},"headline":"Megawatt Charging System (MCS) Deployment in 2026","datePublished":"2026-01-23T10:38:38+00:00","dateModified":"2026-01-26T05:06:40+00:00","mainEntityOfPage":{"@id":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/"},"wordCount":1271,"commentCount":0,"publisher":{"@id":"https:\/\/www.evb.com\/#organization"},"image":{"@id":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp","keywords":["Electric truck charging depot","Heavy-duty EV charging","ISO 15118-20","MCS charging","Megawatt charging infrastructure","Megawatt Charging System","MV interconnect","OCPP 2.0.1","OCSP Stapling","PKI certificate chains","Power sharing","SAE J3271","Thermal de-rating"],"articleSection":["Blog"],"inLanguage":"tr","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/","url":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/","name":"Megawatt Charging System (MCS) Deployment in 2026: Grid, Thermal De-Rating & ISO 15118-20 Reliability","isPartOf":{"@id":"https:\/\/www.evb.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/#primaryimage"},"image":{"@id":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp","datePublished":"2026-01-23T10:38:38+00:00","dateModified":"2026-01-26T05:06:40+00:00","description":"A 2026 engineering guide to MCS deployment: grid-first MV interconnect planning, liquid-cooling thermal de-rating, and ISO 15118-20 TLS session reliability for heavy-duty EV depots and hubs.","breadcrumb":{"@id":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/#primaryimage","url":"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp","contentUrl":"https:\/\/www.evb.com\/wp-content\/uploads\/2025\/12\/split-dc-ev-charging-solution-for-electric-heavy-truck.webp","width":1080,"height":1080,"caption":"split dc ev charging solution for electric heavy truck"},{"@type":"BreadcrumbList","@id":"https:\/\/www.evb.com\/megawatt-charging-system-mcs-deployment-in-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.evb.com\/"},{"@type":"ListItem","position":2,"name":"Megawatt Charging System (MCS) Deployment in 2026"}]},{"@type":"WebSite","@id":"https:\/\/www.evb.com\/#website","url":"https:\/\/www.evb.com\/","name":"EVB","description":"Smart EV Charging &amp; Energy Storage Solutions","publisher":{"@id":"https:\/\/www.evb.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.evb.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/www.evb.com\/#organization","name":"EVB","url":"https:\/\/www.evb.com\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/www.evb.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.evb.com\/wp-content\/uploads\/2021\/03\/evb-3.png","contentUrl":"https:\/\/www.evb.com\/wp-content\/uploads\/2021\/03\/evb-3.png","width":605,"height":626,"caption":"EVB"},"image":{"@id":"https:\/\/www.evb.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.evb.com\/#\/schema\/person\/fe8f0137976034abdfd2ae4f8c5682d0","name":"EVB Editorial Team","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g","caption":"EVB Editorial Team"},"description":"The EVB Editorial Team creates expert content on EV charging infrastructure, commercial charging solutions, energy storage integration, and global charging projects, with input from EVB product and engineering specialists.","sameAs":["https:\/\/www.evb.com\/"]}]}},"_links":{"self":[{"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/posts\/38739","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/comments?post=38739"}],"version-history":[{"count":19,"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/posts\/38739\/revisions"}],"predecessor-version":[{"id":38776,"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/posts\/38739\/revisions\/38776"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/media\/36454"}],"wp:attachment":[{"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/media?parent=38739"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/categories?post=38739"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/tags?post=38739"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}