{"id":39332,"date":"2026-03-25T11:17:27","date_gmt":"2026-03-25T03:17:27","guid":{"rendered":"https:\/\/www.evb.com\/?p=39332"},"modified":"2026-03-25T11:21:04","modified_gmt":"2026-03-25T03:21:04","slug":"how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide","status":"publish","type":"post","link":"https:\/\/www.evb.com\/tr\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\/","title":{"rendered":"2026&#039;da Bir DC H\u0131zl\u0131 \u015earj \u0130stasyonunun Maliyeti Ne Kadar? Tam Ticari K\u0131lavuz"},"content":{"rendered":"<p>Ticari bir elektrikli ara\u00e7 \u015farj projesi planl\u0131yorsan\u0131z, soraca\u011f\u0131n\u0131z ilk sorulardan biri basit olacakt\u0131r: Bir DC h\u0131zl\u0131 \u015farj istasyonunun maliyeti ne kadar?<\/p>\n\n\n\n<p>K\u0131sa cevap: \u00c7ok de\u011fi\u015fkenlik g\u00f6steriyor. 2026 y\u0131l\u0131nda, DC h\u0131zl\u0131 \u015farj i\u00e7in yaln\u0131zca ekipman fiyatland\u0131rmas\u0131, g\u00fc\u00e7 seviyesine, termal tasar\u0131ma ve genel sistem mimarisine ba\u011fl\u0131 olarak, da\u011f\u0131t\u0131c\u0131 ba\u015f\u0131na yakla\u015f\u0131k 10.000 ila 200.000 TL aras\u0131nda de\u011fi\u015febilir. Kurulum, elektrik i\u015fleri, altyap\u0131 iyile\u015ftirmeleri ve saha ko\u015fullar\u0131 dahil edildi\u011finde, \u00e7o\u011fu ticari DC h\u0131zl\u0131 \u015farj projesi genellikle 80.000 ila 250.000 TL ve \u00fczeri aras\u0131nda kal\u0131rken, \u00f6zel trafo merkezleri, entegre batarya depolama veya daha zorlu altyap\u0131ya sahip y\u00fcksek g\u00fc\u00e7l\u00fc tesisler bunun \u00e7ok \u00f6tesine ge\u00e7ebilir. <a href=\"http:\/\/EVB.COm\">EVB<\/a> Ve <a href=\"http:\/\/<a href=&quot;https:\/\/www.beny.com\/&quot; rel=&quot;nofollow&quot;&gt;https:\/\/www.beny.com\/<\/a&gt;\">Ben<\/a>Piyasadaki deneyimimize g\u00f6re, bir \u015fey a\u00e7\u0131k\u00e7a ortada: \u015farj cihaz\u0131 donan\u0131m\u0131 yat\u0131r\u0131m\u0131n sadece bir par\u00e7as\u0131; as\u0131l proje maliyetini ise genellikle saha m\u00fchendisli\u011fi ve \u015febekeye haz\u0131r olma durumu belirliyor.<\/p>\n\n\n\n<p>Bu nedenle, yaln\u0131zca \u015farj cihaz\u0131 donan\u0131m\u0131na odaklanan al\u0131c\u0131lar genellikle ger\u00e7ek b\u00fct\u00e7eyi hafife al\u0131rlar. Ticari al\u0131c\u0131lar i\u00e7in \u015farj kabini b\u00fct\u00e7enin sadece bir par\u00e7as\u0131d\u0131r. Projenin b\u00fct\u00e7eye uygun kal\u0131p kalmayaca\u011f\u0131n\u0131 belirleyen \u015fey genellikle saha m\u00fchendisli\u011fidir.<\/p>\n\n\n\n<p>Pratikte, toplam maliyet genellikle be\u015f fakt\u00f6re ba\u011fl\u0131d\u0131r:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>\u015farj cihaz\u0131 donan\u0131m\u0131<\/li>\n\n\n\n<li>g\u00fc\u00e7 seviyesi<\/li>\n\n\n\n<li>elektrik altyap\u0131s\u0131<\/li>\n\n\n\n<li>in\u015faat i\u015fleri ve tesisat<\/li>\n\n\n\n<li>uzun vadeli i\u015fletme maliyeti<\/li>\n<\/ul>\n\n\n\n<p>Dolay\u0131s\u0131yla daha do\u011fru soru sadece &quot;\u015earj cihaz\u0131n\u0131n maliyeti ne kadar?&quot; de\u011fil, ayn\u0131 zamanda &quot;Tesisin in\u015fas\u0131, i\u015fletimi ve zaman i\u00e7inde \u00f6l\u00e7eklendirilmesi ne kadar maliyetli olacak?&quot; sorusudur.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"720\" src=\"https:\/\/www.evb.com\/wp-content\/uploads\/2023\/09\/Efficient-3-Gun-Design-DC-EV-Charger.webp\" alt=\"Verimli 3 Tabancal\u0131 Tasar\u0131m DC Elektrikli Ara\u00e7 \u015earj Cihaz\u0131\" class=\"wp-image-38801\" srcset=\"https:\/\/www.evb.com\/wp-content\/uploads\/2023\/09\/Efficient-3-Gun-Design-DC-EV-Charger.webp 1280w, https:\/\/www.evb.com\/wp-content\/uploads\/2023\/09\/Efficient-3-Gun-Design-DC-EV-Charger-18x10.webp 18w, https:\/\/www.evb.com\/wp-content\/uploads\/2023\/09\/Efficient-3-Gun-Design-DC-EV-Charger-600x338.webp 600w, https:\/\/www.evb.com\/wp-content\/uploads\/2023\/09\/Efficient-3-Gun-Design-DC-EV-Charger-768x432.webp 768w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><figcaption class=\"wp-element-caption\"><a href=\"https:\/\/www.evb.com\/tr\/by-charging-type\/evb-dc-ev-charging-solutions\/\">EVB DC EV \u015earj Cihaz\u0131<\/a><\/figcaption><\/figure><\/div>\n\n\n<h2 class=\"wp-block-heading\"><strong>DC h\u0131zl\u0131 \u015farj istasyonu nedir?<\/strong><\/h2>\n\n\n\n<p>DC h\u0131zl\u0131 \u015farj istasyonu, y\u00fcksek voltajl\u0131 do\u011fru ak\u0131m\u0131 (DC) do\u011frudan ara\u00e7 ak\u00fcs\u00fcne ileterek AC Seviye 2 \u015farj cihazlar\u0131na g\u00f6re \u00f6nemli \u00f6l\u00e7\u00fcde daha h\u0131zl\u0131 \u015farj imkan\u0131 sa\u011flar. Kuzey Amerika&#039;da bu genellikle Seviye 3 \u015farj olarak adland\u0131r\u0131l\u0131r.<\/p>\n\n\n\n<p>AC \u015farj cihazlar\u0131na k\u0131yasla, DC h\u0131zl\u0131 \u015farj cihazlar\u0131 genellikle \u015fu unsurlar\u0131 i\u00e7erdi\u011finden daha karma\u015f\u0131kt\u0131r:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>daha y\u00fcksek g\u00fc\u00e7 \u00e7\u0131k\u0131\u015f\u0131<\/li>\n\n\n\n<li>daha g\u00fc\u00e7l\u00fc elektrik altyap\u0131s\u0131 gereksinimleri<\/li>\n\n\n\n<li>daha zorlu termal y\u00f6netim<\/li>\n\n\n\n<li>daha b\u00fcy\u00fck kurulum karma\u015f\u0131kl\u0131\u011f\u0131<\/li>\n<\/ul>\n\n\n\n<p>\u0130\u015fte bu y\u00fczden alternatif ak\u0131m (AC) \u015farj\u0131 ile do\u011fru ak\u0131m (DC) h\u0131zl\u0131 \u015farj\u0131 aras\u0131ndaki fiyat fark\u0131 \u00e7ok b\u00fcy\u00fck. Sadece bir \u015farj cihaz\u0131 sat\u0131n alm\u0131yorsunuz. \u00c7o\u011fu durumda, \u00e7ok daha zorlu bir elektrik projesi sat\u0131n al\u0131yorsunuz.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>DC h\u0131zl\u0131 \u015farj istasyonunun g\u00fc\u00e7 seviyesine g\u00f6re maliyeti<\/strong><\/h2>\n\n\n\n<p>Proje maliyetini en \u00e7ok etkileyen fakt\u00f6rlerden biri \u015farj cihaz\u0131n\u0131n g\u00fc\u00e7 seviyesidir. Farkl\u0131 g\u00fc\u00e7 seviyeleri, farkl\u0131 saha tiplerine, ciro modellerine ve i\u015f senaryolar\u0131na hizmet eder.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>30\u201360 kW<\/strong><\/h3>\n\n\n\n<p>Bu aral\u0131k genellikle \u015fu alanlarda kullan\u0131l\u0131r:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>k\u00fc\u00e7\u00fck ticari otoparklar<\/li>\n\n\n\n<li>bayilikler<\/li>\n\n\n\n<li>oteller<\/li>\n\n\n\n<li>i\u015f yerleri<\/li>\n\n\n\n<li>d\u00fc\u015f\u00fck trafikli hedef siteler<\/li>\n<\/ul>\n\n\n\n<p>DC h\u0131zl\u0131 \u015farj teknolojisine giri\u015f i\u00e7in genellikle en kolay eri\u015filebilir y\u00f6ntemdir \u00e7\u00fcnk\u00fc:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>donan\u0131m maliyeti daha d\u00fc\u015f\u00fckt\u00fcr<\/li>\n\n\n\n<li>kurulumu daha az zahmetlidir.<\/li>\n\n\n\n<li>Baz\u0131 yerlerde b\u00fcy\u00fck elektrik tesisat\u0131 yenilemelerinden ka\u00e7\u0131n\u0131labilir.<\/li>\n<\/ul>\n\n\n\n<p>Bu kademe genellikle bekleme s\u00fcresinin daha uzun oldu\u011fu ve amac\u0131n otoyol tarz\u0131 bir \u015farj merkezi kurmadan daha h\u0131zl\u0131 \u015farj sa\u011flamak oldu\u011fu durumlarda en mant\u0131kl\u0131 se\u00e7enektir.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>90\u2013180 kW<\/strong><\/h3>\n\n\n\n<p>Bu genellikle \u015fu durumlar i\u00e7in orta yol anlam\u0131na gelir:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>perakende siteleri<\/li>\n\n\n\n<li>halka a\u00e7\u0131k \u015farj noktalar\u0131<\/li>\n\n\n\n<li>karma ticari ortamlar<\/li>\n\n\n\n<li>kentsel merkezler<\/li>\n<\/ul>\n\n\n\n<p>Pop\u00fcler olmas\u0131n\u0131n nedeni \u015funlar\u0131 sunmas\u0131d\u0131r:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>daha g\u00fc\u00e7l\u00fc \u015farj h\u0131z\u0131<\/li>\n\n\n\n<li>daha geni\u015f EV uyumlulu\u011fu<\/li>\n\n\n\n<li>Orta ila y\u00fcksek trafikli siteler i\u00e7in daha iyi verim<\/li>\n<\/ul>\n\n\n\n<p>Bu seviyede, kurulum karma\u015f\u0131kl\u0131\u011f\u0131 genellikle h\u0131zla artmaya ba\u015flar. Bir\u00e7ok projede, \u015farj cihaz\u0131n\u0131n kendisi art\u0131k tek b\u00fct\u00e7e sorunu olmaktan \u00e7\u0131kar. Trafo kapasitesi, \u015falt cihaz\u0131, koruma tasar\u0131m\u0131 ve saha da\u011f\u0131t\u0131m\u0131 \u00e7ok daha \u00f6nemli hale gelir.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>240\u2013360 kW ve \u00fczeri<\/strong><\/h3>\n\n\n\n<p>Bu aral\u0131k genellikle \u015fu ama\u00e7larla kullan\u0131l\u0131r:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>karayolu koridorlar\u0131<\/li>\n\n\n\n<li>b\u00fcy\u00fck halka a\u00e7\u0131k \u015farj merkezleri<\/li>\n\n\n\n<li>y\u00fcksek kullan\u0131m oran\u0131na sahip filo depolar\u0131<\/li>\n\n\n\n<li>gelece\u011fe haz\u0131r ticari alanlar<\/li>\n<\/ul>\n\n\n\n<p>Bu \u015farj istasyonlar\u0131 \u00e7ok y\u00fcksek ara\u00e7 sirk\u00fclasyonunu destekleyebilir, ancak ayn\u0131 zamanda en b\u00fcy\u00fck bask\u0131y\u0131 \u015fu noktalarda yarat\u0131rlar:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>transformat\u00f6rler<\/li>\n\n\n\n<li>\u015falt cihaz\u0131<\/li>\n\n\n\n<li>\u015febeke ba\u011flant\u0131s\u0131<\/li>\n\n\n\n<li>so\u011futma sistemleri<\/li>\n\n\n\n<li>site i\u015fletme stratejisi<\/li>\n<\/ul>\n\n\n\n<p>Bu seviyede, bir\u00e7ok al\u0131c\u0131 \u015farj cihaz\u0131 donan\u0131m\u0131n\u0131n hikayenin sadece bir par\u00e7as\u0131 oldu\u011funu ke\u015ffeder. G\u00fc\u00e7 ne kadar y\u00fcksekse, elektrik altyap\u0131s\u0131 proje maliyetinin ger\u00e7ek belirleyicisi haline gelir. Bu seviyede, s\u0131v\u0131 so\u011futmal\u0131 teknoloji giderek standart hale geliyor ve bu da d\u00fc\u015f\u00fck g\u00fc\u00e7l\u00fc hava so\u011futmal\u0131 \u00fcnitelerle kar\u015f\u0131la\u015ft\u0131r\u0131ld\u0131\u011f\u0131nda so\u011futma sistemleri i\u00e7in daha \u00f6zel bak\u0131m hususlar\u0131 getiriyor. Bu seviyedeki bak\u0131m genellikle so\u011futma s\u0131v\u0131s\u0131 sa\u011fl\u0131k kontrollerini ve \u00f6zel pompa servisini i\u00e7erir ve bunlar y\u0131ll\u0131k i\u015fletme ve bak\u0131m b\u00fct\u00e7esine dahil edilmelidir. Bu ayn\u0131 zamanda y\u00fcksek g\u00fc\u00e7l\u00fc kurulumlar\u0131n, EVB&#039;nin kendi \u00f6nceki analizi de dahil olmak \u00fczere, daha \u00f6nceki Seviye 3 \u015farj k\u0131lavuzlar\u0131nda yayg\u0131n olarak belirtilen $50.000\u2013$150.000 ekipman aral\u0131\u011f\u0131n\u0131 s\u0131k s\u0131k a\u015fmas\u0131n\u0131n nedenidir.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>G\u00fc\u00e7 seviyelerine g\u00f6re h\u0131zl\u0131 bir maliyet kar\u015f\u0131la\u015ft\u0131rmas\u0131<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>G\u00fc\u00e7 Seviyesi<\/strong><\/th><th><strong>Tipik Kullan\u0131m Senaryosu<\/strong><\/th><th><strong>Donan\u0131m Maliyet Aral\u0131\u011f\u0131<\/strong><\/th><th><strong>Kurulum Karma\u015f\u0131kl\u0131\u011f\u0131<\/strong><\/th><th><strong>En Uygun Olan<\/strong><\/th><\/tr><\/thead><tbody><tr><td>30\u201360 kW<\/td><td>K\u00fc\u00e7\u00fck ticari alanlar, bayilikler, d\u00fc\u015f\u00fck ila orta yo\u011funluklu trafikli lokasyonlar<\/td><td>Daha d\u00fc\u015f\u00fck<\/td><td>Il\u0131man<\/td><td>Daha uzun bekleme s\u00fcresine ve s\u0131n\u0131rl\u0131 \u015febeke kapasitesine sahip alanlar<\/td><\/tr><tr><td>90\u2013180 kW<\/td><td>Perakende, halka a\u00e7\u0131k \u015farj istasyonlar\u0131, karma ticari kullan\u0131m<\/td><td>Orta<\/td><td>Orta ila y\u00fcksek<\/td><td>Daha h\u0131zl\u0131 ciroya ve daha geni\u015f EV uyumlulu\u011funa ihtiya\u00e7 duyan tesisler<\/td><\/tr><tr><td>240\u2013360 kW+<\/td><td>Karayolu koridorlar\u0131, kamu merkezleri, filo depolar\u0131<\/td><td>Y\u00fcksek<\/td><td>Y\u00fcksek<\/td><td>Y\u00fcksek verimlili\u011fe sahip ve kullan\u0131m oran\u0131n\u0131n yat\u0131r\u0131m\u0131 hakl\u0131 \u00e7\u0131kard\u0131\u011f\u0131 tesisler<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Bu tablo bir fiyat teklifi sayfas\u0131 de\u011fil, bir karar k\u0131lavuzudur. Ayn\u0131 \u015farj cihaz\u0131, saha ko\u015fullar\u0131n\u0131za ba\u011fl\u0131 olarak \u00e7ok farkl\u0131 toplam proje b\u00fct\u00e7elerine yol a\u00e7abilir.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2026 Y\u0131l\u0131nda Seviye 2 ve Seviye 3 (DC H\u0131zl\u0131) \u015earj Cihazlar\u0131n\u0131n Maliyet Kar\u015f\u0131la\u015ft\u0131rmas\u0131<\/strong><\/h2>\n\n\n\n<p>Bir\u00e7ok al\u0131c\u0131, toplam proje maliyeti a\u00e7\u0131s\u0131ndan DC h\u0131zl\u0131 \u015farj\u0131n (Seviye 3) standart AC Seviye 2 \u015farj cihazlar\u0131yla nas\u0131l kar\u015f\u0131la\u015ft\u0131r\u0131ld\u0131\u011f\u0131n\u0131 soruyor.<\/p>\n\n\n\n<p>2026 y\u0131l\u0131nda, tipik bir ticari Seviye 2 projesinin kurulum maliyeti, DC h\u0131zl\u0131 \u015farj cihaz\u0131na g\u00f6re genellikle \u00e7ok daha d\u00fc\u015f\u00fckt\u00fcr. Bir\u00e7ok Seviye 2 kurulumu, port ba\u015f\u0131na birka\u00e7 bin dolar aral\u0131\u011f\u0131nda ger\u00e7ekle\u015firken, DC h\u0131zl\u0131 \u015farj projeleri, elektrik y\u00fckseltmeleri, altyap\u0131 \u00e7al\u0131\u015fmalar\u0131 ve saha ko\u015fullar\u0131 dahil edildi\u011finde genellikle 80.000 ila 250.000+ dolar aral\u0131\u011f\u0131nda maliyetlere ula\u015fmaktad\u0131r. Aradaki fark\u0131n temel nedenleri, daha y\u00fcksek g\u00fc\u00e7 gereksinimleri, transformat\u00f6r kapasitesi ve daha karma\u015f\u0131k kurulum ve izin s\u00fcre\u00e7leridir. Orta d\u00fczeyde trafi\u011fe ve daha uzun bekleme s\u00fcrelerine sahip tesisler i\u00e7in Seviye 2 hala daha uygun maliyetli bir se\u00e7enek olabilir. Y\u00fcksek sirk\u00fclasyonlu tesisler i\u00e7in ise DC h\u0131zl\u0131 \u015farj\u0131n daha y\u00fcksek veri aktar\u0131m h\u0131z\u0131, daha y\u00fcksek ba\u015flang\u0131\u00e7 yat\u0131r\u0131m\u0131n\u0131 hakl\u0131 \u00e7\u0131karabilir.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>DC h\u0131zl\u0131 \u015farj projelerinde en \u00e7ok hafife al\u0131nan maliyet<\/strong><\/h2>\n\n\n\n<p>B\u00fct\u00e7e k\u0131s\u0131tlamalar\u0131 kapsam\u0131nda al\u0131c\u0131lar\u0131n en \u00e7ok hafife ald\u0131\u011f\u0131 bir unsur varsa, o da genellikle \u015farj kutusu de\u011fil, onun etraf\u0131ndaki her \u015feydir.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Elektrik altyap\u0131s\u0131<\/strong><\/h3>\n\n\n\n<p>Bu genellikle \u015funlar\u0131 i\u00e7erir:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>transformat\u00f6r y\u00fckseltmeleri<\/li>\n\n\n\n<li>\u015falt cihaz\u0131<\/li>\n\n\n\n<li>paneller<\/li>\n\n\n\n<li>koruma ekipman\u0131<\/li>\n\n\n\n<li>kablo y\u00f6nlendirme<\/li>\n\n\n\n<li>da\u011f\u0131t\u0131m yeniden tasar\u0131m\u0131<\/li>\n<\/ul>\n\n\n\n<p>Bir\u00e7ok ger\u00e7ek projede, b\u00fct\u00e7eyi en \u00e7ok de\u011fi\u015ftiren \u015fey budur. Ayn\u0131 \u015farj cihaz\u0131n\u0131 kullanan iki lokasyonun toplam maliyetleri, bir lokasyonda zaten uygun elektrik kapasitesi varken di\u011ferinde olmamas\u0131 nedeniyle \u00e7ok farkl\u0131 olabilir. Bu nedenle, \u00fc\u00e7\u00fcnc\u00fc taraf maliyet k\u0131lavuzlar\u0131 s\u00fcrekli olarak geni\u015f kurulum maliyeti aral\u0131klar\u0131 g\u00f6stermektedir.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>\u015eebeke ba\u011flant\u0131s\u0131 ve bekleme s\u00fcresi<\/strong><\/h3>\n\n\n\n<p>\u015earj cihaz\u0131 mevcut olsa bile, proje \u015fu nedenlerle aylarca beklemek zorunda kalabilir:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>hizmet onay\u0131<\/li>\n\n\n\n<li>hizmet y\u00fckseltmeleri<\/li>\n\n\n\n<li>transformat\u00f6r teslimat\u0131<\/li>\n\n\n\n<li>yerel elektrik \u015firketiyle koordinasyon<\/li>\n<\/ul>\n\n\n\n<p>Pratikte, b\u00fcy\u00fcme genellikle \u015farj cihaz\u0131 \u00fcretiminden de\u011fil, elektrik tedarik s\u00fcresinden dolay\u0131 gecikir.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>\u0130n\u015faat i\u015fleri<\/strong><\/h3>\n\n\n\n<p>Bu genellikle \u015funlar\u0131 i\u00e7erir:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>hendek kazma<\/li>\n\n\n\n<li>beton i\u015fleri<\/li>\n\n\n\n<li>koruyucu babalar<\/li>\n\n\n\n<li>temeller<\/li>\n\n\n\n<li>tabela<\/li>\n\n\n\n<li>site restorasyonu<\/li>\n<\/ul>\n\n\n\n<p>Bu maliyetler, sahan\u0131n durumuna b\u00fcy\u00fck \u00f6l\u00e7\u00fcde ba\u011fl\u0131 olduklar\u0131 i\u00e7in hafife al\u0131nmalar\u0131 kolayd\u0131r.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>\u0130zin ve denetim<\/strong><\/h3>\n\n\n\n<p>\u0130zinler genellikle k\u00fc\u00e7\u00fck bir kalem olarak ele al\u0131n\u0131r, ancak buradaki gecikmeler \u015funlar\u0131 etkileyebilir:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>proje takvimi<\/li>\n\n\n\n<li>y\u00fcklenici maliyeti<\/li>\n\n\n\n<li>\u015febeke koordinasyonu<\/li>\n\n\n\n<li>lansman zamanlamas\u0131<\/li>\n<\/ul>\n\n\n\n<p>\u015earj cihaz\u0131 h\u0131zl\u0131ca sipari\u015f edilebilir, ancak tesisin yasal ve elektriksel olarak haz\u0131r hale getirilmesi \u00e7ok daha uzun s\u00fcrebilir.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Ticari bir DC h\u0131zl\u0131 \u015farj projesinde tipik maliyet payla\u015f\u0131mlar\u0131<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>Maliyet Katman\u0131<\/strong><\/th><th><strong>Toplam Proje Maliyetinin Tipik Pay\u0131<\/strong><\/th><th><strong>Notlar<\/strong><\/th><\/tr><\/thead><tbody><tr><td>\u015earj cihaz\u0131 donan\u0131m\u0131<\/td><td>30\u201345%<\/td><td>G\u00fc\u00e7 seviyesine ve so\u011futma tasar\u0131m\u0131na b\u00fcy\u00fck \u00f6l\u00e7\u00fcde ba\u011fl\u0131d\u0131r.<\/td><\/tr><tr><td>Elektrik altyap\u0131s\u0131<\/td><td>30\u201340%<\/td><td>Transformat\u00f6r, \u015falt cihaz\u0131, panolar, kablolama, koruma<\/td><\/tr><tr><td>\u0130n\u015faat i\u015fleri + izin alma<\/td><td>15\u201320%<\/td><td>Kaz\u0131, beton, bariyerler, levhalar, denetimler<\/td><\/tr><tr><td>Yaz\u0131l\u0131m + acil durum planlamas\u0131<\/td><td>10\u201315%<\/td><td>Arka u\u00e7, \u00f6deme, ba\u011flant\u0131, risk tamponu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Bu y\u00fczdeler evrensel de\u011fildir. Bunlar pratik bir planlama \u00e7er\u00e7evesidir. Daha basit yerlerde, \u015farj cihaz\u0131 donan\u0131m\u0131 bask\u0131n olabilir. K\u0131s\u0131tl\u0131 alanlarda ise elektrik i\u015fleri h\u0131zla en b\u00fcy\u00fck gider kalemi haline gelebilir.<\/p>\n\n\n\n<p>Not: Bir\u00e7ok projede, mod\u00fcler donan\u0131m ba\u015flang\u0131\u00e7 ekipman b\u00fct\u00e7esini biraz art\u0131rabilir, ancak tekrarlanan in\u015faat i\u015fleri, kaz\u0131, yeniden yap\u0131land\u0131rma ve \u015fantiye kesintilerinden ka\u00e7\u0131narak gelecekteki geni\u015fleme maliyetlerini \u00f6nemli \u00f6l\u00e7\u00fcde azaltabilir.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>\u015earj cihaz\u0131 donan\u0131m maliyeti ile kurulum maliyeti kar\u015f\u0131la\u015ft\u0131rmas\u0131<\/strong><\/h2>\n\n\n\n<p>S\u0131k yap\u0131lan bir hata, \u00f6nce \u015farj cihaz\u0131n\u0131n fiyat\u0131n\u0131 sormak ve gerisini ikinci planda tutmakt\u0131r.<\/p>\n\n\n\n<p>Ger\u00e7ekte:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Donan\u0131m maliyeti g\u00f6r\u00fcn\u00fcr durumda.<\/li>\n\n\n\n<li>Kurulum maliyeti, lokasyona g\u00f6re de\u011fi\u015fir.<\/li>\n\n\n\n<li>\u0130\u015fletme maliyetleri, devreye alma i\u015fleminden \u00e7ok sonra da devam eder.<\/li>\n<\/ul>\n\n\n\n<p>Bu, bir tesisin 120 kW&#039;l\u0131k bir \u015farj cihaz\u0131n\u0131 nispeten makul bir toplam maliyetle kurabilece\u011fi, ba\u015fka bir tesisin ise ayn\u0131 \u015farj cihaz\u0131 i\u00e7in \u00e7ok daha fazla para harcayabilece\u011fi anlam\u0131na gelir, \u00e7\u00fcnk\u00fc:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>kablo uzunlu\u011fu daha uzundur<\/li>\n\n\n\n<li>Kaz\u0131 yapmak daha zordur.<\/li>\n\n\n\n<li>altyap\u0131 y\u00fckseltmesi daha b\u00fcy\u00fck<\/li>\n\n\n\n<li>G\u00fc\u00e7 odas\u0131n\u0131n tadilata ihtiyac\u0131 var.<\/li>\n\n\n\n<li>\u0130zin alma s\u00fcreci daha yava\u015f.<\/li>\n<\/ul>\n\n\n\n<p>Bu nedenle, ayn\u0131 \u015farj cihaz\u0131n\u0131 kullanan iki yerin toplam b\u00fct\u00e7eleri \u00e7ok farkl\u0131 olabilir: \u015farj cihaz\u0131 ayn\u0131 kalabilir, ancak elektrik i\u015fleri nadiren ayn\u0131 kal\u0131r.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Kurulum sonras\u0131 i\u015fletme maliyetleri<\/strong><\/h2>\n\n\n\n<p>Bir DC h\u0131zl\u0131 \u015farj projesi, \u015farj cihaz\u0131 kurulduktan sonra da maliyet \u00fcretmeye devam eder.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Elektrik maliyeti<\/strong><\/h3>\n\n\n\n<p>Bu, en belirgin s\u00fcrekli maliyettir. Ne kadar \u00e7ok enerji satarsan\u0131z, tarife yap\u0131s\u0131 o kadar \u00f6nem kazan\u0131r.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Talep \u00fccretleri<\/strong><\/h3>\n\n\n\n<p>Bir\u00e7ok b\u00f6lgede, talep \u00fccretleri karl\u0131l\u0131\u011f\u0131 \u00f6nemli \u00f6l\u00e7\u00fcde etkileyebilir. Y\u00fcksek g\u00fc\u00e7l\u00fc bir tesis, tepe talep dikkatli bir \u015fekilde y\u00f6netilmezse, keskin maliyet dalgalanmalar\u0131yla kar\u015f\u0131 kar\u015f\u0131ya kalabilir. Bu nedenle, ciddi al\u0131c\u0131 k\u0131lavuzlar\u0131 art\u0131k i\u015fletme maliyetini sonradan d\u00fc\u015f\u00fcn\u00fclen bir unsur de\u011fil, yat\u0131r\u0131m karar\u0131n\u0131n bir par\u00e7as\u0131 olarak ele almaktad\u0131r.<\/p>\n\n\n\n<p>Tek bir y\u00fcksek g\u00fc\u00e7l\u00fc \u015farj seans\u0131, bir tesisin t\u00fcm faturalama d\u00f6nemi i\u00e7in talep \u00fccreti riskini art\u0131rabilir. Bu nedenle, ak\u0131ll\u0131 g\u00fc\u00e7 y\u00f6netimi ve tamponlama stratejileri, 2026&#039;da y\u00fcksek g\u00fc\u00e7 gerektiren bir\u00e7ok tesis i\u00e7in art\u0131k iste\u011fe ba\u011fl\u0131 de\u011fil, zorunlu hale gelmi\u015ftir.<\/p>\n\n\n\n<p>\u0130leriye d\u00f6n\u00fck olarak, baz\u0131 geli\u015fmi\u015f DC \u015farj istasyonlar\u0131, zaman i\u00e7inde talep \u00fccreti risklerinin bir k\u0131sm\u0131n\u0131 dengelemeye yard\u0131mc\u0131 olabilecek ara\u00e7-\u015febeke entegrasyon stratejilerini ara\u015ft\u0131rmaya ba\u015fl\u0131yor.<\/p>\n\n\n\n<p>Uzun vadeli de\u011feri de\u011ferlendirirken, bir\u00e7ok i\u015fletmeci art\u0131k bir DC h\u0131zl\u0131 \u015farj istasyonunun Toplam Sahip Olma Maliyetini (TCO) hesapl\u0131yor; bu da donan\u0131m, kurulum, elektrik, bak\u0131m, yaz\u0131l\u0131m ve \u00e7ok y\u0131ll\u0131k bir i\u015fletme d\u00f6nemi boyunca potansiyel geliri i\u00e7eriyor. En g\u00fc\u00e7l\u00fc i\u015f gerek\u00e7esi genellikle \u015farj cihaz\u0131n\u0131n g\u00fcc\u00fcn\u00fc ger\u00e7ek trafik modellerine, bekleme s\u00fcresine ve saha kullan\u0131m\u0131na uyarlamaktan gelir.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Yaz\u0131l\u0131m ve arka u\u00e7 sistemleri<\/strong><\/h3>\n\n\n\n<p>Ticari DC \u015farj i\u015flemleri genellikle \u015funlar\u0131 gerektirir:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>\u015farj cihaz\u0131 y\u00f6netim yaz\u0131l\u0131m\u0131<\/li>\n\n\n\n<li>ba\u011flant\u0131<\/li>\n\n\n\n<li>izleme<\/li>\n\n\n\n<li>\u00f6deme sistemleri<\/li>\n\n\n\n<li>faturalama entegrasyonu<\/li>\n\n\n\n<li>uzaktan bak\u0131m ara\u00e7lar\u0131<\/li>\n<\/ul>\n\n\n\n<p>Bunlar tek tek bak\u0131ld\u0131\u011f\u0131nda b\u00fcy\u00fck g\u00f6r\u00fcnmeyebilir, ancak zamanla toplam sahip olma maliyetinin bir par\u00e7as\u0131 haline gelirler.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Bak\u0131m ve servis<\/strong><\/h3>\n\n\n\n<p>\u015earj cihaz\u0131n\u0131n g\u00fcc\u00fc artt\u0131k\u00e7a, servis karma\u015f\u0131kl\u0131\u011f\u0131 da genellikle artar. Bak\u0131m \u015funlar\u0131 i\u00e7erebilir:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>ba\u011flant\u0131 a\u015f\u0131nmas\u0131<\/li>\n\n\n\n<li>kablo ta\u015f\u0131ma sorunlar\u0131<\/li>\n\n\n\n<li>so\u011futma sistemi servisi<\/li>\n\n\n\n<li>yaz\u0131l\u0131m sorun giderme<\/li>\n\n\n\n<li>yedek par\u00e7alar<\/li>\n<\/ul>\n\n\n\n<p>Daha d\u00fc\u015f\u00fck sat\u0131n alma fiyat\u0131 her zaman daha d\u00fc\u015f\u00fck \u00f6m\u00fcr boyu maliyet anlam\u0131na gelmez.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Toplam proje maliyetini en \u00e7ok etkileyen fakt\u00f6r nedir?<\/strong><\/h2>\n\n\n\n<p>Pratikte, toplam maliyeti en \u00e7ok etkileyen birka\u00e7 fakt\u00f6r vard\u0131r.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Tesisin g\u00fc\u00e7 kullan\u0131labilirli\u011fi<\/strong><\/h3>\n\n\n\n<p>E\u011fer arazide zaten g\u00fc\u00e7l\u00fc bir elektrik altyap\u0131s\u0131 varsa, proje daha h\u0131zl\u0131 ilerleyebilir ve daha az maliyetli olabilir. Aksi takdirde, \u015farj cihaz\u0131n\u0131n fiyat\u0131, beklenenden daha k\u00fc\u00e7\u00fck bir paya sahip olabilir.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>\u015earj cihaz\u0131 g\u00fc\u00e7 seviyesi<\/strong><\/h3>\n\n\n\n<p>Daha y\u00fcksek g\u00fc\u00e7 \u015fu anlama gelir:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>daha y\u00fcksek ekipman maliyeti<\/li>\n\n\n\n<li>daha b\u00fcy\u00fck kurulum karma\u015f\u0131kl\u0131\u011f\u0131<\/li>\n\n\n\n<li>elektrik sistemine daha fazla bask\u0131<\/li>\n\n\n\n<li>potansiyel olarak daha y\u00fcksek i\u015fletme maliyeti riski<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Trafik ve kullan\u0131m<\/strong><\/h3>\n\n\n\n<p>Talep istikrarl\u0131 olan bir site, trafi\u011fi belirsiz olan bir siteye g\u00f6re daha b\u00fcy\u00fck bir yat\u0131r\u0131m\u0131 daha kolay hakl\u0131 \u00e7\u0131karabilir.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Geni\u015fleme stratejisi<\/strong><\/h3>\n\n\n\n<p>A\u015famal\u0131 b\u00fcy\u00fcme i\u00e7in tasarlanm\u0131\u015f bir alan, ilk g\u00fcnden itibaren gere\u011finden b\u00fcy\u00fck olup y\u0131llarca kullan\u0131lmayan bir alana k\u0131yasla genellikle finansal a\u00e7\u0131dan daha mant\u0131kl\u0131d\u0131r.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>DC h\u0131zl\u0131 \u015farj\u0131n yat\u0131r\u0131ma de\u011fer oldu\u011fu durumlar ve olmad\u0131\u011f\u0131 durumlar<\/strong><\/h2>\n\n\n\n<p>Her tesis, kar\u015f\u0131layabilece\u011fi en b\u00fcy\u00fck \u015farj cihaz\u0131n\u0131 kurmak zorunda de\u011fildir.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Yat\u0131r\u0131m\u0131n kar\u015f\u0131l\u0131\u011f\u0131n\u0131 genellikle \u015fu durumlarda verir:<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Trafik istikrarl\u0131 ve tahmin edilebilir.<\/li>\n\n\n\n<li>bekleme s\u00fcresi k\u0131sad\u0131r.<\/li>\n\n\n\n<li>ciro konular\u0131<\/li>\n\n\n\n<li>Filo sevk\u0131yat\u0131 \u015farj h\u0131z\u0131na ba\u011fl\u0131d\u0131r<\/li>\n\n\n\n<li>Bu tesis, uzun vadeli bir \u015farj a\u011f\u0131 stratejisinin par\u00e7as\u0131d\u0131r.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>\u015eu durumlarda yat\u0131r\u0131ma de\u011fmeyebilir:<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>trafik \u00e7ok d\u00fc\u015f\u00fck<\/li>\n\n\n\n<li>Ara\u00e7lar zaten uzun s\u00fcre park halinde kal\u0131yor.<\/li>\n\n\n\n<li>\u015eebeke iyile\u015ftirmeleri \u00e7ok yava\u015f veya \u00e7ok pahal\u0131.<\/li>\n\n\n\n<li>Talep \u00fccretleri, i\u015f plan\u0131n\u0131 ortadan kald\u0131rabilir.<\/li>\n\n\n\n<li>\u015earj cihaz\u0131 esas olarak imaj yaratmak i\u00e7in tak\u0131l\u0131yor, kullan\u0131m i\u00e7in de\u011fil.<\/li>\n<\/ul>\n\n\n\n<p>\u00c7o\u011fu durumda, yanl\u0131\u015f \u015farj cihaz\u0131 daha ucuz veya daha pahal\u0131 olan de\u011fil, ger\u00e7ek site ekonomisine uymayan \u015farj cihaz\u0131d\u0131r.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Siteniz i\u00e7in do\u011fru g\u00fc\u00e7 seviyesini nas\u0131l se\u00e7ersiniz?<\/strong><\/h2>\n\n\n\n<p>K\u00fc\u00e7\u00fck bir ticari alan, perakende \u015farj noktas\u0131 ve filo deposu ayn\u0131 \u015farj stratejisine ihtiya\u00e7 duymaz.<\/p>\n\n\n\n<p>Genel kural olarak:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Konaklama s\u00fcresi uzunsa, enerjiye a\u015f\u0131r\u0131 harcama yapmak getiriyi art\u0131rmayabilir.<\/li>\n\n\n\n<li>Ciro kritik \u00f6nem ta\u015f\u0131yorsa, \u015farj cihaz\u0131n\u0131n yetersiz boyutland\u0131r\u0131lmas\u0131 saha performans\u0131n\u0131 olumsuz etkileyebilir.<\/li>\n\n\n\n<li>E\u011fer tesisin ileride geni\u015flemesi planlan\u0131yorsa, hemen a\u015f\u0131r\u0131 in\u015faat yapmaktansa mod\u00fcler planlama genellikle daha mant\u0131kl\u0131d\u0131r.<\/li>\n<\/ul>\n\n\n\n<p>En iyi \u015farj cihaz\u0131 her zaman en b\u00fcy\u00fck olan\u0131 de\u011fildir. En iyi \u015farj cihaz\u0131, sitenin destekleyebilece\u011fi, verimli bir \u015fekilde kullanabilece\u011fi ve birlikte b\u00fcy\u00fcyebilece\u011fi \u015farj cihaz\u0131d\u0131r.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1600\" src=\"https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915.jpeg\" alt=\"EVB DC h\u0131zl\u0131 \u015farj cihaz\u0131 serisi, kamu ve ticari elektrikli ara\u00e7 \u015farj uygulamalar\u0131 i\u00e7in tasarlanm\u0131\u015ft\u0131r.\" class=\"wp-image-38753\" srcset=\"https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915.jpeg 2560w, https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915-1536x960.jpeg 1536w, https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915-2048x1280.jpeg 2048w, https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915-18x12.jpeg 18w, https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915-600x375.jpeg 600w, https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/20251217-163915-768x480.jpeg 768w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><figcaption class=\"wp-element-caption\"><a href=\"https:\/\/www.evb.com\/tr\/\">EVB&#039;nin H\u0131zl\u0131 \u015earj Cihaz\u0131 <\/a><\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>EVB tavsiyesi<\/strong><\/h2>\n\n\n\n<p>Ticari al\u0131c\u0131lar i\u00e7in en ak\u0131ll\u0131ca hareket, bug\u00fcn\u00fcn ihtiya\u00e7lar\u0131n\u0131 kar\u015f\u0131layan ve ayn\u0131 zamanda gelecekteki b\u00fcy\u00fcmeyi de koruyan bir \u015farj platformu se\u00e7mektir.<\/p>\n\n\n\n<p>EVB&#039;nin DC h\u0131zl\u0131 \u015farj \u00e7\u00f6z\u00fcmleri gibi ger\u00e7ek mod\u00fcler geni\u015fleme \u00f6zelli\u011fine sahip platformlar, bug\u00fcn ihtiyac\u0131n\u0131z olan g\u00fcc\u00fc do\u011fru boyutland\u0131rman\u0131za ve trafik artt\u0131k\u00e7a maliyetli in\u015faat i\u015flerini veya gereksiz saha aksamalar\u0131n\u0131 tekrarlamadan daha sorunsuz bir \u015fekilde \u00f6l\u00e7eklendirmenize olanak tan\u0131r.<\/p>\n\n\n\n<p>2026 DC h\u0131zl\u0131 \u015farj projenizi hayata ge\u00e7irmeye haz\u0131r m\u0131s\u0131n\u0131z? <a href=\"https:\/\/www.evb.com\/tr\/lets-connect\/\">Bug\u00fcn bizimle ileti\u015fime ge\u00e7in.<\/a> \u00dccretsiz yerinde de\u011ferlendirme ve tam konumunuza, elektrik eri\u015filebilirli\u011finize ve beklenen kullan\u0131m\u0131n\u0131za g\u00f6re uyarlanm\u0131\u015f \u00f6zel bir fiyat teklifi i\u00e7in.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>SSS<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Bir DC h\u0131zl\u0131 \u015farj istasyonunun fiyat\u0131 ne kadar?<\/strong><\/h3>\n\n\n\n<p>Bu, \u015farj cihaz\u0131n\u0131n g\u00fcc\u00fcne, elektrik altyap\u0131s\u0131na, kurulum karma\u015f\u0131kl\u0131\u011f\u0131na ve i\u015fletme maliyetine ba\u011fl\u0131d\u0131r. Sadece ekipman fiyatland\u0131rmas\u0131, da\u011f\u0131t\u0131c\u0131 ba\u015f\u0131na yakla\u015f\u0131k 10.000 ila 200.000+ TL aras\u0131nda de\u011fi\u015febilirken, kurulu proje maliyeti, saha ko\u015fullar\u0131na ba\u011fl\u0131 olarak \u00e7ok daha y\u00fcksek olabilir.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Seviye 3 \u015farj, DC h\u0131zl\u0131 \u015farj ile ayn\u0131 \u015fey midir?<\/strong><\/h3>\n\n\n\n<p>\u00c7o\u011fu ticari g\u00f6r\u00fc\u015fmede evet. Kuzey Amerika&#039;da Seviye 3 genellikle DC h\u0131zl\u0131 \u015farj\u0131 ifade eder.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>DC h\u0131zl\u0131 \u015farj projesindeki en b\u00fcy\u00fck gizli maliyet nedir?<\/strong><\/h3>\n\n\n\n<p>Bir\u00e7ok projede en \u00e7ok hafife al\u0131nan maliyet kalemi elektrik altyap\u0131s\u0131d\u0131r; \u00f6zellikle trafo y\u00fckseltmeleri, \u015falt cihazlar\u0131 ve \u015febeke ba\u011flant\u0131 \u00e7al\u0131\u015fmalar\u0131.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>\u015earj cihaz\u0131n\u0131n donan\u0131m\u0131 en b\u00fcy\u00fck maliyet kalemi mi?<\/strong><\/h3>\n\n\n\n<p>Her zaman de\u011fil. S\u0131n\u0131rl\u0131 alanlarda veya kapsaml\u0131 kaz\u0131 ve trafo y\u00fckseltmeleri gerektiren yerlerde, kurulum, elektrik i\u015fleri ve in\u015faat i\u015fleri genellikle donan\u0131m maliyetine e\u015fit veya ondan daha y\u00fcksek olabilir.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Daha y\u00fcksek g\u00fc\u00e7l\u00fc \u015farj cihazlar\u0131 her zaman daha iyi bir i\u015f stratejisi midir?<\/strong><\/h3>\n\n\n\n<p>Hay\u0131r. Daha b\u00fcy\u00fck bir \u015farj istasyonu her zaman daha iyi getiri sa\u011flamaz. Cevap, trafi\u011fe, bekleme s\u00fcresine, g\u00fc\u00e7 kullan\u0131labilirli\u011fine ve saha ekonomisine ba\u011fl\u0131d\u0131r.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Al\u0131c\u0131lar \u015farj cihaz\u0131 se\u00e7meden \u00f6nce nelere dikkat etmelidir?<\/strong><\/h3>\n\n\n\n<p>G\u00fc\u00e7 kapasitesini, saha d\u00fczenini, beklenen trafi\u011fi, kullan\u0131m oran\u0131n\u0131, kurulum karma\u015f\u0131kl\u0131\u011f\u0131n\u0131, yaz\u0131l\u0131m gereksinimlerini ve gelecekteki geni\u015fleme planlar\u0131n\u0131 g\u00f6zden ge\u00e7irmeleri gerekir.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>2026 y\u0131l\u0131nda 350 kW DC h\u0131zl\u0131 \u015farj cihaz\u0131n\u0131n maliyeti ne kadar?<\/strong><\/h3>\n\n\n\n<p>350 kW&#039;l\u0131k ultra h\u0131zl\u0131 DC \u015farj cihazlar\u0131 genellikle DC h\u0131zl\u0131 \u015farj maliyet spektrumunun \u00fcst ucunda yer al\u0131r. Sadece donan\u0131m bile daha d\u00fc\u015f\u00fck g\u00fc\u00e7l\u00fc \u00fcnitelerden \u00f6nemli \u00f6l\u00e7\u00fcde daha pahal\u0131 olabilir ve b\u00fcy\u00fck \u015febeke iyile\u015ftirmeleri, transformat\u00f6r \u00e7al\u0131\u015fmalar\u0131 veya y\u00fcksek g\u00fc\u00e7l\u00fc saha altyap\u0131s\u0131 gerekti\u011finde kurulum proje maliyeti \u00f6nemli \u00f6l\u00e7\u00fcde artabilir. Bu sistemler, h\u0131zl\u0131 d\u00f6n\u00fc\u015f\u00fcn yat\u0131r\u0131m\u0131 hakl\u0131 \u00e7\u0131kard\u0131\u011f\u0131 otoyol koridorlar\u0131, y\u00fcksek kapasiteli toplu ta\u015f\u0131ma merkezleri ve y\u00fcksek kullan\u0131m oran\u0131na sahip filo uygulamalar\u0131 i\u00e7in en uygundur.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Ticari ama\u00e7l\u0131 kullan\u0131lan bir DC h\u0131zl\u0131 \u015farj istasyonunun port ba\u015f\u0131na ortalama maliyeti nedir?<\/strong><\/h3>\n\n\n\n<p>\u015earj istasyonu ba\u015f\u0131na kurulum maliyeti, \u015farj cihaz\u0131n\u0131n g\u00fcc\u00fcne, saha d\u00fczenine, elektrik iyile\u015ftirmelerine ve in\u015faat karma\u015f\u0131kl\u0131\u011f\u0131na ba\u011fl\u0131 olarak b\u00fcy\u00fck \u00f6l\u00e7\u00fcde de\u011fi\u015febilir. D\u00fc\u015f\u00fck g\u00fc\u00e7l\u00fc ticari projeler, y\u00fcksek g\u00fc\u00e7l\u00fc halka a\u00e7\u0131k \u015farj merkezlerinin \u00e7ok alt\u0131nda kalabilirken, daha tipik 90-180 kW&#039;l\u0131k ticari kurulumlar genellikle daha geni\u015f DC h\u0131zl\u0131 \u015farj maliyet yelpazesinin orta aral\u0131\u011f\u0131na denk gelir.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>\u00d6zetle<\/strong><\/h2>\n\n\n\n<p>\u00d6z\u00fcnde, bir DC h\u0131zl\u0131 \u015farj istasyonunun ger\u00e7ek maliyeti sadece \u015farj cihaz\u0131n\u0131n kendisiyle ilgili de\u011fildir. Ger\u00e7ek bir sahada donan\u0131m, elektrik altyap\u0131s\u0131, kurulum ve i\u015fletme ekonomisinin nas\u0131l bir araya geldi\u011fiyle ilgilidir.<\/p>","protected":false},"excerpt":{"rendered":"<p>If you are planning a commercial EV charging project, one of the first questions you will ask is simple: how much does a DC fast charging station cost? The short answer: it varies widely. In 2026, equipment-only pricing for DC fast charging can range from roughly $10,000 to over $200,000 per dispenser, depending on power [&hellip;]<\/p>","protected":false},"author":3,"featured_media":38655,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[214,216,212,211,176,215,217,213],"class_list":["post-39332","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-commercial-ev-charging","tag-dc-charging-tco","tag-dc-fast-charger-cost","tag-dc-fast-charging-station-cost","tag-demand-charges","tag-ev-charging-station-installation","tag-grid-upgrade-cost","tag-level-3-charging-cost"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>DC Fast Charging Station Cost in 2026: Full Commercial Guide<\/title>\n<meta name=\"description\" content=\"In 2026, most commercial DC fast charging projects cost $80,000\u2013$250,000+ installed. Learn hardware, installation, grid upgrade, TCO, and ROI factors in this complete buyer\u2019s guide.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.evb.com\/tr\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"DC Fast Charging Station Cost in 2026: Full Commercial Guide\" \/>\n<meta property=\"og:description\" content=\"In 2026, most commercial DC fast charging projects cost $80,000\u2013$250,000+ installed. Learn hardware, installation, grid upgrade, TCO, and ROI factors in this complete buyer\u2019s guide.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.evb.com\/tr\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\/\" \/>\n<meta property=\"og:site_name\" content=\"EVB\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-25T03:17:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-25T03:21:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/1-1000-750-scaled.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"evb\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"evb\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\\\/\"},\"author\":{\"name\":\"evb\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/#\\\/schema\\\/person\\\/fe8f0137976034abdfd2ae4f8c5682d0\"},\"headline\":\"How Much Does a DC Fast Charging Station Cost in 2026? Full Commercial Guide\",\"datePublished\":\"2026-03-25T03:17:27+00:00\",\"dateModified\":\"2026-03-25T03:21:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\\\/\"},\"wordCount\":2430,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/1-1000-750-scaled.webp\",\"keywords\":[\"commercial EV charging\",\"DC charging TCO\",\"DC fast charger cost\",\"DC fast charging station cost\",\"demand charges\",\"EV charging station installation\",\"grid upgrade cost\",\"Level 3 charging cost\"],\"articleSection\":[\"Blog\"],\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.evb.com\\\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\\\/\",\"url\":\"https:\\\/\\\/www.evb.com\\\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\\\/\",\"name\":\"DC Fast Charging Station Cost in 2026: Full Commercial Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/1-1000-750-scaled.webp\",\"datePublished\":\"2026-03-25T03:17:27+00:00\",\"dateModified\":\"2026-03-25T03:21:04+00:00\",\"description\":\"In 2026, most commercial DC fast charging projects cost $80,000\u2013$250,000+ installed. Learn hardware, installation, grid upgrade, TCO, and ROI factors in this complete buyer\u2019s guide.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.evb.com\\\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/1-1000-750-scaled.webp\",\"contentUrl\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/1-1000-750-scaled.webp\",\"width\":2560,\"height\":1920,\"caption\":\"100 kW\\\/241 kWh liquid-cooled ess 180kW DC fast charger Lithuania Nordic\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.evb.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How Much Does a DC Fast Charging Station Cost in 2026? Full Commercial Guide\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/#website\",\"url\":\"https:\\\/\\\/www.evb.com\\\/\",\"name\":\"EVB\",\"description\":\"Smart EV Charging &amp; Energy Storage Solutions\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.evb.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/#organization\",\"name\":\"EVB\",\"url\":\"https:\\\/\\\/www.evb.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/evb-3.png\",\"contentUrl\":\"https:\\\/\\\/www.evb.com\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/evb-3.png\",\"width\":605,\"height\":626,\"caption\":\"EVB\"},\"image\":{\"@id\":\"https:\\\/\\\/www.evb.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.evb.com\\\/#\\\/schema\\\/person\\\/fe8f0137976034abdfd2ae4f8c5682d0\",\"name\":\"evb\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g\",\"caption\":\"evb\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"DC Fast Charging Station Cost in 2026: Full Commercial Guide","description":"In 2026, most commercial DC fast charging projects cost $80,000\u2013$250,000+ installed. Learn hardware, installation, grid upgrade, TCO, and ROI factors in this complete buyer\u2019s guide.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.evb.com\/tr\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\/","og_locale":"tr_TR","og_type":"article","og_title":"DC Fast Charging Station Cost in 2026: Full Commercial Guide","og_description":"In 2026, most commercial DC fast charging projects cost $80,000\u2013$250,000+ installed. Learn hardware, installation, grid upgrade, TCO, and ROI factors in this complete buyer\u2019s guide.","og_url":"https:\/\/www.evb.com\/tr\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\/","og_site_name":"EVB","article_published_time":"2026-03-25T03:17:27+00:00","article_modified_time":"2026-03-25T03:21:04+00:00","og_image":[{"width":2560,"height":1920,"url":"https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/1-1000-750-scaled.webp","type":"image\/webp"}],"author":"evb","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"evb","Tahmini okuma s\u00fcresi":"12 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.evb.com\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\/#article","isPartOf":{"@id":"https:\/\/www.evb.com\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\/"},"author":{"name":"evb","@id":"https:\/\/www.evb.com\/#\/schema\/person\/fe8f0137976034abdfd2ae4f8c5682d0"},"headline":"How Much Does a DC Fast Charging Station Cost in 2026? Full Commercial Guide","datePublished":"2026-03-25T03:17:27+00:00","dateModified":"2026-03-25T03:21:04+00:00","mainEntityOfPage":{"@id":"https:\/\/www.evb.com\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\/"},"wordCount":2430,"commentCount":0,"publisher":{"@id":"https:\/\/www.evb.com\/#organization"},"image":{"@id":"https:\/\/www.evb.com\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\/#primaryimage"},"thumbnailUrl":"https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/1-1000-750-scaled.webp","keywords":["commercial EV charging","DC charging TCO","DC fast charger cost","DC fast charging station cost","demand charges","EV charging station installation","grid upgrade cost","Level 3 charging cost"],"articleSection":["Blog"],"inLanguage":"tr","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.evb.com\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.evb.com\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\/","url":"https:\/\/www.evb.com\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\/","name":"DC Fast Charging Station Cost in 2026: Full Commercial Guide","isPartOf":{"@id":"https:\/\/www.evb.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.evb.com\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\/#primaryimage"},"image":{"@id":"https:\/\/www.evb.com\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\/#primaryimage"},"thumbnailUrl":"https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/1-1000-750-scaled.webp","datePublished":"2026-03-25T03:17:27+00:00","dateModified":"2026-03-25T03:21:04+00:00","description":"In 2026, most commercial DC fast charging projects cost $80,000\u2013$250,000+ installed. Learn hardware, installation, grid upgrade, TCO, and ROI factors in this complete buyer\u2019s guide.","breadcrumb":{"@id":"https:\/\/www.evb.com\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.evb.com\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/www.evb.com\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\/#primaryimage","url":"https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/1-1000-750-scaled.webp","contentUrl":"https:\/\/www.evb.com\/wp-content\/uploads\/2026\/01\/1-1000-750-scaled.webp","width":2560,"height":1920,"caption":"100 kW\/241 kWh liquid-cooled ess 180kW DC fast charger Lithuania Nordic"},{"@type":"BreadcrumbList","@id":"https:\/\/www.evb.com\/how-much-does-a-dc-fast-charging-station-cost-in-2026-full-commercial-guide\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.evb.com\/"},{"@type":"ListItem","position":2,"name":"How Much Does a DC Fast Charging Station Cost in 2026? Full Commercial Guide"}]},{"@type":"WebSite","@id":"https:\/\/www.evb.com\/#website","url":"https:\/\/www.evb.com\/","name":"EVB","description":"Smart EV Charging &amp; Energy Storage Solutions","publisher":{"@id":"https:\/\/www.evb.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.evb.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/www.evb.com\/#organization","name":"EVB","url":"https:\/\/www.evb.com\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/www.evb.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.evb.com\/wp-content\/uploads\/2021\/03\/evb-3.png","contentUrl":"https:\/\/www.evb.com\/wp-content\/uploads\/2021\/03\/evb-3.png","width":605,"height":626,"caption":"EVB"},"image":{"@id":"https:\/\/www.evb.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.evb.com\/#\/schema\/person\/fe8f0137976034abdfd2ae4f8c5682d0","name":"evb","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6919cc4e91e3745783933e1263b15b0bed21b5e46f2b1e21643aa8b29240d0f7?s=96&d=mm&r=g","caption":"evb"}}]}},"_links":{"self":[{"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/posts\/39332","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/comments?post=39332"}],"version-history":[{"count":3,"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/posts\/39332\/revisions"}],"predecessor-version":[{"id":39336,"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/posts\/39332\/revisions\/39336"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/media\/38655"}],"wp:attachment":[{"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/media?parent=39332"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/categories?post=39332"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.evb.com\/tr\/wp-json\/wp\/v2\/tags?post=39332"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}